My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10197546 - Permit (2)
PBA
>
Building
>
Permits
>
G
>
Gunther St
>
126 S Gunther St
>
10197546 - Permit (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/29/2022 10:31:32 AM
Creation date
11/29/2022 10:31:30 AM
Metadata
Fields
Template:
Permit
Permit Number
10197546
Full Address
126 S Gunther St
Permit ID
245351
Master ID Number
2018-145761
Project Name
Miscellaneous Counter1 Permit
Street Number
000126
Street Direction
S
Street Name
Gunther
Street Suffix
St
Building Use Code
Resid-1 unit
Job Types
Solar
Permit Type
Building
Applied Date
8/29/2018
Issued Date
8/29/2018
Finalized Date
9/20/2018
Flood Zone
X-0602320256J
Description of Work
Installation of roof mounted PV system. SFD has (e) solar pv system. Worksheet attached to plans.
Nature of Work
Solar
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
RESIDENTIAL <br />PHOTOVOLTAIC <br />CHECKLIST <br />sol-01 cBC 2013 <br />Solar Photovoltaic (PV) Checklist for Detached SINGLE FAMILY RESIDENCES Onty <br />lnstruclions: The licensed contractor of record shall fill in the address of the project, contractor's <br />licensing information and answer questions 1 -10 below. Complete and sign the certification section. <br />"*lf answering NO to any of the questions, plan check shall be required.** <br />P roj ect Address: 126 SOUTH GUNTHER STREE1' SANTA ANA, CA92704 <br />Contractor Company Name:STAR SUN SOLAR <br />Contractor License Number:$ 1008302 <br />6 tru <br />Are the following applicable to the proposed project? <br />Will the PV array be flush mounted to the existing roof so that the plane of the <br />modules (panels) are parallel to the plane of the roof? <br />Will the PV system weigh maximum 3 pounds per square feet or less? <br />Will the PV system be installed where the modules do not overhang any roof edges <br />(such as eaves, gabled ends, ridges and hips)? <br />Will the PV system be installed with a space of 2" minimum to l0" maximum between <br />the underside of modules and the surface of the roof? <br />Will the PV system be installed without using any ballast system or counter-weight <br />system? <br />Will the PV system be installed on a roof having only one roofing layer with no <br />overlays? <br />Will the PV system layout provide a three-foot wide clear access pathway per the <br />latest edition oI "Guideline for Fire Safety Elements of Solar Photovoltaic Systems" <br />by OCFA? (Guideline available on the OCFA website: htto://uryvw.ocfa.orq) <br />Do the plans show a maximum horizontal anchor spacing of 6 feet? <br />Do the plans show a minimum of 2-112 inch lag screw embedment into roof rafters? <br />Are ALL the structural pages of the plans WET stamped and signed by a California <br />licensed professional engineer? (including project specific site plan, PV layout, <br />anchorage spacing, anchorage details and manufacturer's PV support information.) <br />Eltr <br />I certify under penalty of perjury under the laws of the State of California that the above is true: <br />Print name: Shane Cunningham Signature <br />Phone Number: <br />Email Address <br />2 <br />3 <br />4 <br />5 <br />8 trtr <br />9. Etr <br />10 EE <br />YES NO <br />Ertr <br />Etr <br />Etr <br />Etr <br />atr <br />7 <br />Rev:2h7/2015 <br />7t4 370.8877 Date: 81312018 <br />*,SNIA <br />NA,ffi <br />Planning & Building Agency <br />Building Safety Division <br />20 Civic Center Plaza <br />P.O. Box 1988 (M-19) <br />Santa Ana, C492702 <br />(714) 647-s800 <br />www.santa.ana,org <br />1
The URL can be used to link to this page
Your browser does not support the video tag.