My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
20166743 - Permit (2)
PBA
>
Building
>
Permits
>
G
>
Grovemont St
>
2213 E Grovemont St
>
20166743 - Permit (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/29/2022 10:31:33 AM
Creation date
11/29/2022 10:31:32 AM
Metadata
Fields
Template:
Permit
Permit Number
20166743
Full Address
2213 E Grovemont St
Permit ID
245080
Master ID Number
2018-145597
Project Name
Miscellaneous Counter1 Permit
Street Number
002213
Street Direction
E
Street Name
Grovemont
Street Suffix
St
Building Use Code
Resid-1 unit
Job Types
Solar
Permit Type
Electrical
Applied Date
8/22/2018
Issued Date
8/22/2018
Finalized Date
4/1/2019
Flood Zone
X-0602320164J
Description of Work
Install solar panels/fees pd 10197462
Nature of Work
Solar
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Planning & Building Agency <br />Building Saf€ty Division <br />20 Civic Centor Plaza <br />P.O. Box 1988 (M-19) <br />Santa Ana, CA 92702 <br />(714) 647-5800 <br />www.santa-ana.oag <br />Project Add ress:22I3 GROVEMONT ST, SANTA ANA, CA 92705 <br />Contractor Company 111266. FREEDOM FOREVER <br />Contractor License Numbor: C l0 t 1029644 <br />RESIDENTIAL <br />PHOTOVOLTAIC <br />CHECKLIST <br />YES NOtrtr <br />Etr <br />Etr <br />Btrtro <br />8tr <br />EID <br />trtr <br />EItr <br />EItr <br />I <br />'10 <br />R€v 1l/19/2015 <br />2 <br />3 <br />Are the following applicable to the proposed proiect? <br />Will lhe PV system layout provide the required three-foot wide clear access pathways <br />per Section 605.1 1 of the California Fire Code, and is this shown on the roof plan? <br />Will the PV system be installed on a roof having only one roofing layer with no <br />overlays? <br />Will the PV anay be flush mounted to the existing roof so that the plane of the <br />modules (panels) are parallei to the plane of the roof? <br />Will the PV system weigh maximum 4 pounds per square feet or less? <br />Will the PV system be installed where the modules do not overhang any roof edges <br />(such as eaves, gabled ends, ridges and hips)? <br />Will the PV system be installed with a space of 2" minimum to 't0" maximum between <br />the underside of modules and lhe surface of the roof? <br />Will lhe PV system be installed without using any ballast system or counter-weight <br />system? <br />Will the anchors be installed with a maximum horizontal anchor spacing of 6 feet <br />and is this maximum horizontal spacing shown on the plans? <br />Wll the minimum 5/16" lag screws be installed with a minimum of 2-112 inch <br />embedment into roof rafters (with pre-drilled holes) and is this minimum embedment <br />shown on the plans? <br />Are ALL the structural pages of the plans stamped and signed by a California <br />licensed professional engineer? (including project specific site plan. PV layout, <br />anchorage spacing, anchorage details and manufacturer's PV support information.) <br />nalty of periury under the laws ot the State of California that the above is true <br />Signat <br />4 <br />5 <br />6 <br />7 <br />8 <br />I corlify und <br />Print Name <br />Phone Number: g5l -239-() <br />Email Address: karbuckletafreedomfbrever.com <br />*,,SAN[A <br />NAJ}ffi <br />Solar Photovoltaic (PV) Checklist for Oetached STNGLE FAMTLY RESTDENCES Onty <br />lnstructions: The licensed contractor of record shall complete all sections, answer the ten questions and <br />sign the certiflcation section below. A copy of this form shall be attached to each of TWO sets of ptans, of <br />minimum 11" x 17"size. lf answerino NOtoanvof the questions, olan check shall be reouired.
The URL can be used to link to this page
Your browser does not support the video tag.