Laserfiche WebLink
-,-SANTA <br />NA <br />III\IIG <br />tBlrrDlc <br />$tIil <br />Planning & Building Agency <br />Building Safety Division <br />20 Civic Center Plaza <br />P.O. Box'1988 (M-l9) <br />Santa Ana, CA927O2 <br />(714) 647-s800 <br />www.santa-ana.org <br />RESIDENTIAL <br />PHOTOVOLTA!C <br />CHECKLIST <br />Solar Photovoltaic (PV) Checklist for Detached SINGLE FAMILY RESIDENCES Only <br />lnstructions: The licensed conlraclor of record shall ,ill in the address ofthe project, conlraclor's <br />licensing information and answer questions 1 -10 below. Complete and sign the certification section*'lf ansurering NO to any ofthe questions, plan check shall be required," <br />Project Address:1026 SOUTH ARAPAHO DRIVE SANTA ANA, CA 92703 <br />STAR SUN SOLAR <br /># 1008302 <br />YES NO Are the following applicable to the proposed project? <br />Will the PV array be flush mounted to the existing roofso that the plane ofthe <br />modules (panels) are parallel to the plane of the roof? <br />Will the PV system weigh maximum 3 pounds per square feet or less? <br />Wll the PV system be installed where the modules do not overhang any roof edges <br />(such as eaves, gabled ends, ridges and hips)? <br />\Mll the PV system be installed with a space of 2" minimum to 10" maximum between <br />the underside of modules and the surface of the roof? <br />vvill the PV system be installed without using any ballasl system or counter-weight <br />system? <br />Vvill the PV system be installed on a roof having only one roofing layer with no <br />overlays? <br />VMllthe PV system layout provide a three-foot wide clear access pathway perthe <br />latest edition oI 'Guideline tor Fire Safety Elements of Solar Photovoltaic Systems" <br />by OCFA? (Guideline available on lhe OCFA website: htto://www.ocfa.oro) <br />Do the plans show a maximum horizontal anchor spacing of 6 feet? <br />Do the plans show a minimum oI 2-112 inch lag screw embedment into roof raflers? <br />Are ALL the struciural pages of the plans WET slamped and signed by a California <br />licensed professional enOineel? (including project specific slte plan, PV layout, <br />anchorage spacing, anchorage details and manufadurefs PV support information.) <br />I B u <br />tr <br />tr <br />x <br />tr <br />trtr <br />Etr <br />trtr <br />trtr <br />8. trB <br />e. trtr <br />10.EE <br />I certify under penalty of perjury under the laws of the State of Califomia that the above is true: <br />Print name: CUONG HOANG Signature <br />Phone Number:(714) 370-8877 <br />Email Address: <br />Revt 2h712015 <br />cuong-hoano@sbcolobal.net <br />Dale: 6/2512018 <br />soL{1 cBC 2013 <br />Contractor Company Name: <br />Contractor License Number: <br />2. <br />4. <br />5. <br />6. <br />7.