My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10197177 - Permit (2)
PBA
>
Building
>
Permits
>
F
>
Freeman Ln
>
2713 N Freeman Ln
>
10197177 - Permit (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/8/2022 10:34:27 AM
Creation date
12/8/2022 10:34:26 AM
Metadata
Fields
Template:
Permit
Permit Number
10197177
Full Address
2713 N Freeman Ln
Permit ID
244176
Master ID Number
2018-145012
Project Name
Miscellaneous Counter1 Permit
Street Number
002713
Street Direction
N
Street Name
Freeman
Street Suffix
Ln
Building Use Code
Resid-1 unit
Job Types
Solar
Permit Type
Building
Applied Date
7/30/2018
Issued Date
7/30/2018
Finalized Date
4/3/2019
Flood Zone
X-0602320144J
Description of Work
Install new solar PV roof mounted system. Per PV checklist.
Nature of Work
Solar
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Planning & Building Agency <br />Building Safety Division <br />20 Civic Center Plaza <br />P.O. Box 1988 (M-19) <br />Santa Ana. CA 92702 <br />(714) 647-5800 <br />www.santa-ana.org <br />RESIDENTIAL <br />PHOTOVOLTA!C <br />CHECKLIST <br />soL{1 cBC 2013 <br />Solar Photovoltaic (PV) Checklist for Detached SINGLE FAMILY RESIDENCES Only <br />lnstructions: The licensed contractor of record shall fill in the address of the project, contractods <br />licensing information and answer questions 1 -10 below. Complete and sign the certification section**lf answering NO to any of the questionsj plan check shall be required.** <br />Proj ect Address: TllZ P' Tit*fv\t"*, C"t't <br />a <br />3 <br />Contractor Company Name: <br />Contractor License Number <br />Eltr <br />7 trtr <br />I certify under <br />Print name <br />Phone Number: <br />Email Address: <br />Hosopo Corp DBA Horizon Solar Power <br />YES NO <br />Eltr <br />trtr <br />Eltr <br />Etr <br />Eltr <br />1004233 <br />Are the following applicable to the proposed project? <br />Will the PV anay be flush mounted to lhe existing roof so that the plane of the <br />modules (panels) are parallel to lhe plane of the roof? <br />Will the PV system weagh maximum 3 pounds per square feet or less? <br />VMll the PV system be installed where the modules do not overhang any roof edges <br />(such as eaves, gabled ends, ridges and hips)? <br />Will the PV system be installed with a space of 2" minimum to 10" maximum between <br />the underside of modules and the surface of lhe roof? <br />Wll the PV system be installed without using any ballast system or counter-weight <br />system? <br />Wll the PV system be installed on a roof having only one roofing layer wth no <br />overlays? <br />Wll the PV system layout provide a threejoot wde clear access pathway per the <br />latest edition of 'Guideline for Fire Safety Elements of Solar Photovoltaic Systems" <br />by OCFA? (Guideline available on the OCFA website: http.i iw!n/v. ocfa. orq) <br />Do the plans show a maximum honzontal anchor spacing of 6 feet? <br />Do the plans show a minimum of 2-112 inch lag screw embedment into roof rafters? <br />Are ALL the structural pages of the plans WET stamped and signed by a California <br />ljcensed professional engineer? (including project speciflc site plan, PV layout, <br />anchorage spacing, anchorage details and manufacturefs PV support information.) <br />a yofpe laws of the State of Californ t the above is true: <br />4 <br />5 <br />6 <br />8 Eltre Eltr <br />10 EE <br />,,HM'IP <br />Signature <br />Date: ? <br />Rev Z17ln15 <br />( <br />;-,,SANTA <br />NA-'[Hi <br />1
The URL can be used to link to this page
Your browser does not support the video tag.