Laserfiche WebLink
City of Santa Ana <br />Permit Counter: (7141 647-5800 <br />20 Civic Center Plaza (M-19), Santa Ana, C492702 Electrical Permit #: 2O166{ 60 <br />Pin #: 51669lnspection Requests: (7 1 41 667 -27 38 lnspector Section: (714) 647-5853 <br />Unit: <br />Block: NA <br />Bldg: <br />Tract: NA <br />AddressRange: 3600-3770 <br />Historic: No <br />Suite Range: <br />Zoning: SP2 <br />E <br />Assessor'sParcel:'144-262-01 Lot: NA <br />Owner: <br />Address: <br />Wal.Mart <br />3600 W. McFadden Avs. <br />Santa Ana, CA 92704 <br />Fee Type <br />01116002 51603 FWU <br />01116002 51600 General PIan Update <br />01'116002 51603 lssuance <br />Amount <br />23.87 <br />21 .25 <br />52.98 <br />Qty <br />'1.00 <br />1.00 <br />1.00 <br />Fee <br />$23.87 <br />$21 .25 <br />$52.98Phone <br />Tenant Name:First Samoan Congregational Church <br />Owner-Builder <br />Phone <br />State Lic #: <br />Lic Type: <br />Bus. Lic #: <br />Workers' Compensation lnsurance: <br />Carrier: <br />Policy #: <br />Expires: <br />Building Use: <br />Job Type: <br />Nature of Work <br />Occupancy: <br />Constr Type <br />Code: <br />N/A <br />N/A <br />cEc 2015 Notes: Handout given/fees pd in full on M-71110 <br />Planning Conditions: <br />Planning Approval By: <br />Plan Checked By: <br />Permit lssued By: <br />Subject to Field: <br />Building Permit #: <br />Link, Patricia <br />Date <br />Date <br />Date 06/13/2018 <br />Account# <br />Misc. Receipt: 71110 <br />lvlisc. Receipt: <br />NIisc. Receipt: <br />Total <br />$98 10 <br />$98 10 <br />$0.00 <br />lnspector MID#: 2018-143970 <br />N/A - No Balance Fee Total: <br />Paid to Date: <br />Balance Oue: <br />Project Address: 3600 W McFadden Ave <br />Contraclor: <br />Address: <br />Other <br />Miscellaneous <br />Fireworks Sland <br />Every permit issued shall become invalid unless tho wor* o, the sLe <br />authoized by such parmit is cotnfienced within 1 80 days after its <br />issuanca, ot if the wo authorized on the sito by such pennit is suspended <br />ot abandonod fot a peiod of 180 days after the time the wotk is <br />commenced.