Laserfiche WebLink
Plannlng & Building Agency <br />Bulldlng Safety Dlvision <br />20 Clvic Cent€r Plaza <br />P.O. Box 1988 (H-'19) <br />Santa Ana, C492702 <br />(714) 8476800 <br />www.aanta-ana.org <br />RESIDENTIAL <br />PHOTOVOLTAIC <br />CHECKLIST <br />sol-01 cBc 2013 <br />Solar Photovoltalc (PV) Checkllst for Detached SINGLE FAMILY RESIDENCES Only <br />lnstructlons: The licensed contractor of record shall complete all sections, answer the ten questions and <br />sign the certification section below. A copy of this form shall be attached to each of TWO sets of plans, of <br />minimum 11' x 17" size. lf answe rino NO to anv of the questions . olan check 6hall be reouired. <br />Projoct Address:825 English St, Santa Ana, CA 92703, US <br />Contractor Company 1"r". Solarcity <br />BBB 104Contractor License Number: <br />YES NOtrtr Are the followlng applicable to the proposed project? <br />Will the PV system layout provide the required three.foot wide clear access pathways <br />per Section 605.'ll of the California Fire Code, and is this shown on the roof plan? <br />Will the PV system be installed on a roof having only one roofing layer with no <br />overlays? <br />Will the PV array be flush mounted to the €xisting roof so that lhe plane of the <br />modules (panels) are parallel to lhe plane of the roof? <br />Will the PV system weigh maximum 4 pounds per square feet or less? <br />Will the PV system be installed where the modules do not overhang any roof edges <br />(such as eaves, gabled ends, ridges and hips)? <br />Will the PV system be installed with a space of 2" minimum to 10'maximum betw6en <br />the underside of modules and the surface of the roof? <br />Will the PV system be installed without using any ballast system or counter-weight <br />system? <br />Will the anchors be installed with a maximum horizontal anchor spacing of 6 feet <br />and is this maximum horizontal spacing shown on the plans? <br />Will the minimum 5/16" lag screws be installed with a minimum o12-112 inch <br />embedment into roof rafters (with pre{rilled holes) and is this minimum embedment <br />shown on the plans? <br />Are ALL the structural pages of the plans WET slamped and signed by a California <br />licensed professional engineer? (including prolect specific site plan, PV layout, <br />anchorage spacing, anchorage details and manufacturer's PV support information.) <br />2 <br />1 <br />9 <br />trtr <br />ao <br />trtr <br />@tr <br />Eltr <br />atr <br />4 <br />5 <br />6 <br />7 <br />I Eltr <br />gtr <br />10 trtr <br />I certlfy under penalty ot periury under the laws of tho <br />PrintName: NlrQfrSSd IDXX s <br />State ol <br />rg <br />Phone Number:uz-lq 6 eAqq 961s. 5/30/2018 <br />Email Address: <br />Rev: 8/17f2015 <br />[\l fr x x tar rn i {,4,4i1) @.1Qr4a. aTm <br />ia that tho ls true: <br />-'-SANTA <br />NAIIiHI