Laserfiche WebLink
**SNIA <br />NA,ffi <br />Planning & Building Agency <br />Building Safely Division <br />20 Civic Center Plaza <br />P.O. Box 1988 (M-19) <br />Santa Ana, CA 92702 <br />(714) 647.5800 <br />www.santa-ana.org <br />RESIDENTIAL <br />PHOTOVOLTAIC <br />CHECKLIST <br />soL-o1 cBC 2013 <br />Solar Photovoltaic (PV) Checklist for Detached SINGLE FAMILY RESIDENCES Only <br />lnstructions: The licensed contractor of record shall complete all sections, answer the ten questions and <br />sign the certification section below. A copy of this form shall be attached to each of TWO sets of plans, of <br />minimum 11' x 17" size. lf answerin o NO to anv of the questions .o lan c heck shall be reouired. <br />Proiect Address: <br />Contractor Company Name: <br />Contractor License Number: <br />d I <br />YES NO1 dtr <br />,dJ <br />3 dtr <br />^deuda <br />{o <br />{o <br />{a <br />da <br />{= <br />6 <br />7 <br />I <br />4efl4b <br />Are the following applicable to the proposed project? <br />Will the PV system layout provide the required three-foot wide clear access pathways <br />per Section 605.1 '1 of the California Fire Code, and is this shown on the roof plan? <br />Will the PV system be installed on a roof having only one roofing layer with no <br />overlays? <br />Will the PV array be flush mounted to the exlsting roof so that the plane of the <br />modules (panels) are parallel to the plane of the roof? <br />Will the PV system weigh maximum 4 pounds per square feet or less? <br />Will the PV system be installed where the modules do not overhang any roof edges <br />(such as eaves, gabled ends, ridges and hips)? <br />Will the PV system be installed with a space of 2" minimum to l0" maximum between <br />the underside of modules and the surface of the roof? <br />Will the PV system be installed without using any ballast system or counter-weight <br />system? <br />Will the anchors be installed with a maximum horizontal anchor spacing of 6 feet <br />and is this maximum horizontal spacing shown on the plans? <br />Will the minimum 5/16" lag screws be installed with a minimum ot 2-112 inch <br />embedment into roof rafters (with pre-drilled holes) and is this minimum embedment <br />shown on the plans? <br />Are ALL the structural pages of the plans stamped and signed by a California <br />iicensed professional engineer? (including proJect specific site plan, PV layout, <br />anchorage spacing, anchorage details and manufacturer's PV support information.) <br />'10 <br />I certify under penalty of perjury <br />Print Namer frfrrm fntffin <br />under the laws of the State of California that the ab <br />v <br />Phone Number <br />Email Address: <br />Rev 11i 19/2015 <br />Da:r-: f ) <br />is true; <br />I <br />Signature: