Laserfiche WebLink
Planning & Building Agency <br />Building Safety Division <br />20 Civic Center Plaza <br />P.O. Box 1988 (M-19) <br />Santa Ana, CA'92702 <br />(714) 647-s800 <br />www.santa-ana.org <br />RESIDENTIAL <br />PHOTOVOLTAIC <br />GHECKLIST <br />soL-01 cBc 2013 <br />Solar Photovoltaic (PV) Checklist for Detached SINGLE FAMILY RESIDENCES Only <br />Instructions: The licensed contractor of record shall fill in the address of the project, contractois <br />licensing information and answer questions 1 -10 below. Complete and sign the certification section.**lf answering NO to any of the questions, plan check shall be required.** <br />Project Address:1345 S. PARTON STREET <br />Contractor Gompany Name: <br />Contractor License Number: <br />1 Eltr <br />trtrtrtr <br />trtr <br />trtr5 <br />8 Eltr <br />9. Etr <br />10. BE <br />6. trtr <br />7 trtr <br />I certify under penalty of <br />Print name: /3 <br />p under the laws of the State of California th the above is true: <br />Date:Phone Number: <br />Email Address: <br />Rev.2117l2O15 <br />-'-SANTA <br />ANA,'i,il,l+l <br />YES NO Are the following applicable to the proposed project? <br />Will the PV array be flush mounted to the existing roof so that the plane of the <br />modules (panels) are parallel to the plane of the roof? <br />Will the PV system weigh maximum 3 pounds per square feet or less? <br />Will the PV system be installed where the modules do not overhang any roof edges <br />(such as eaves, gabled ends, ridges and hips)? <br />Will the PV system be installed with a space of 2" minimum to 10" maximum between <br />the underside of modules and the surface of the roof? <br />Will the PV system be installed without using any ballast system or counter-weight <br />system? <br />Will the PV system be installed on a roof having only one roofing layer with no <br />overlays? <br />Will the PV system layout provide a three-foot wide clear access pathway per the <br />latest edition of "Guideline for Fire Safety Elements of Solar Photovoltaic Systems" <br />by OCFA? (Guideline available on the OCFA website: hto://www.ocfa.orq) <br />Do the plans show a maximum horizontal anchor spacing of 6 feet? <br />Do the plans show a minimum of 2-112 inch lag screw embedment into roof rafters? <br />Are ALL the structural pages of the plans WET stamped and signed by a California <br />licensed professional engineer? (including project specific site plan, PV layout, <br />anchorage spacing, anchorage details and manufactureis PV support information.) <br />2. <br />,) <br />4. <br />Signature: