My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10198507 - Permit (2)
PBA
>
Building
>
Permits
>
S
>
Spurgeon St
>
2219 N Spurgeon St
>
10198507 - Permit (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/13/2022 4:49:42 PM
Creation date
12/13/2022 4:49:40 PM
Metadata
Fields
Template:
Permit
Permit Number
10198507
Full Address
2219 N Spurgeon St
Permit ID
248617
Master ID Number
2018-147973
Project Name
Miscellaneous Counter1 Permit
Street Number
002219
Street Direction
N
Street Name
Spurgeon
Street Suffix
St
Building Use Code
Resid-1 unit
Job Types
Solar
Permit Type
Building
Applied Date
11/28/2018
Issued Date
11/28/2018
Finalized Date
1/2/2019
Flood Zone
X-0602320163J
Description of Work
Install new roof mounted solar PV system. Per PV checklist.
Nature of Work
Solar
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Solar Photovoltaic (PV) Checklist for Detached SINGLE FAMILY RESIDENCES Only <br />SOL-01 C BC 2013 <br />s, of <br />Contractor GomPanY Name: <br />Contractor License Number: <br />YES NO <br />00 b <br />1 ,AA <br />,6a <br />fra <br />ga <br />7a <br />EA <br />da <br />10 tr <br />Phone Number; <br />Email Address: <br />Ul ll'YL? <br />Are the following applicable to the proposed proiect? <br />Will the PV system layout provide the required three-fo:l wige clear access pathways <br />per Section 605.11 of the C'"t#'''i''"i"Je' and is this shown on the roof plan? <br />WillthePVsystembeinstalledonaroofhavingonlyoneroofinglayerwithno <br />overlaYs? <br />Will the PV array be flush mounted to the existing roof so that the plane of the <br />ffi;i;; tp*"r.1 ,* parallel to the plane of the roof? <br />WillthePVsystemweighmaximum4poundspersquarefeetorless? <br />Will the PV system be installed where the modules do not overhang any roof edges <br />iil ;. eavls, gabled ends' ridges and hips)? <br />Will the PV system be installed with a space of 2" minimum to 10" maximum between <br />*" ,"i"tt"-J "i'odules <br />and the sufface of the roof? <br />w* the pV system be instared without using any balrast system or counter-weight <br />system? <br />Will the anchors be installed with a maximum horizontal anchor spacing of 6 feet <br />""i i"in,. ,*',um horizontal spacing shown on the plans? <br />Will the minimum 5/16" lag screws be installed with a minim-um of 2'112 inch <br />embedment into roof ,"tt"* t*iti p*-ariii"J r,"r*l and is this minimum embedment <br />shown on the Plans? <br />AreALLtheStructuralpagesoftheplansstampedandsignedbyaCalifornia <br />licensed professionut "ng'n"""'z'(iniuoing <br />project sPecific site plan' PV layout' <br />anchorage spacing, anchorag; i;;i't ;"i';nufacturer's PV support informatron ) <br />2 <br />3 <br />4 <br />5 <br />da <br />7a <br />6 <br />7 <br />I <br />I <br />I certify under alty oI periu e laws of the State of Ca nt at the above is true: <br />Print Name <br />Signature ( <br />Date <br />,--SANTA <br />NArir,ilffi <br />Planning & Building Agency <br />Building SafetY Division <br />20 Civic Center Plaza <br />P.O. Box 1988 (M-tg) <br />Santa Ana, CA 92702 <br />(7'14) 647-5800 <br />www.santa'ana.org <br />RESIDENTIAL <br />PHOTOVOLTAIG <br />CHECKLIST <br />lnstructions: The licensed contractor of record shall comPlete sections, answer and <br />all <br />sign the certification below. A coPY of this form shall be to each of <br />section <br />attached <br />minimum 11" x 17" size <br />Project Address:ryL\q n"
The URL can be used to link to this page
Your browser does not support the video tag.