Laserfiche WebLink
Planning & Building Agency <br />Building Safety Oivision <br />20 Civic Center Plaza <br />P.O. Box 1988 (M-19) <br />Santa Ana, CA 92702 <br />(714) 647-s800 <br />lvww.santa-ana.org <br />RESIDENTIAL <br />PHOTOVOLTAIC <br />CHECKLIST <br />soL-o1 cBc 2013 <br />Solar Photovoltaic (PV) Checklist for Detached SINGLE FAMILY RESTDENGES Only <br />Instructions: The licensed contractor of record shall complete all sections, answer the ten questions and <br />sign the certification section below. A copy of this form shall be aftached to each of TWO sets of plans, of <br />minimum 11" x 17" size. lf answerino NO to anv of the questions. olan check shall be reouired. <br />Project Address:An S ?en",iS St <br />Contractor Company Name: <br />Contractor License Number: <br />rnl Solar')weLo tLc <br />q1i-l6b <br />Are the following applicable to the proposed project? <br />Will the PV system layout provide the required three-foot wide clear access pathways <br />per Section 605.'11 of the California Fire Code, and is this shown on the roof plan? <br />Will the PV system be installed on a roof having only one roofing layer with no <br />overlays? <br />Will the PV array be flush mounted to the existing roof so that the plane of the <br />modules (panels) are parallel to the plane of the roof? <br />Will the PV system weigh maximum 4 pounds per square feet or less? <br />Will the PV system be installed where the modules do not overhang any roof edges <br />(such as eaves, gabled ends, ridges and hips)? <br />Will the PV system be installed with a space of 2" minimum to l0" maximum between <br />the underside of modules and the surface of the roof? <br />Will the PV system be installed without using any ballast system or counter-weight <br />system? <br />Will the anchors be installed with a maximum horizontal anchor spacing of 6 feet <br />and is this maximum horizontal spacing shown on the plans? <br />Will the minimum 5/16" lag screws be installed with a minimum o12-112inch <br />embedment into roof rafters (with pre-drilled holes) and is this minimum embedment <br />shown on the plans? <br />Are ALL the structural pages of the plans stamped and signed by a Califomia <br />licensed professional engineer? (including project speciflc site plan, PV layout, <br />anchorage spacing, anchorage details and manufacturer's PV support information.) <br />I certify under penalty ol perjury under the laws of the State of California <br />printName: Lar.g Clarl<at a <br />Signature <br />Date: 9Phone Number: <br />Email Address: n o <br />L+L 12- <br />Revr 11/19/20'15 <br />2- <br />,--SANTA <br />NA-',,:iffi <br />YES/{O <br />1. E[Ll <br />,ds <br />3dJ <br />,da5da <br />6da <br />,. da <br />sda <br />,. dJ <br />n{a