Laserfiche WebLink
J <br />Planning & Building Agency <br />Building Safety Division <br />20 Civic Center Plaza <br />P.O. Box '1988 (Nl-19) <br />Santa Ana, CA 92702 <br />(714) 647.5800 <br />www.santa-ana.org <br />ptrqrntrNTtal <br />PHOTOVOLTAIC <br />CHECKL!ST <br />sol-or c8c 2013 <br />Solar Photovoltaic (PV) Checklist for Detached SINGLE FAMILY RESIDENCES Only <br />lnstructions: The licensed contractor of record shall complete all sections, answer the ten questions and <br />sign the certification section below. A copy of this form shall be attached to each of TWO sets of plans, of <br />minimum 11'x 17' size lf answerinq NO to an v of the ouestions. olan chec k s hall be required. <br />Proj ectAddress: Z}t-.l I LeL'\JiS Sf <br />\s\/nContractor Company Name: <br />Contractor License N umber:"lSOlrtq <br />Are the following applicable to the proposed project? <br />Will the PV system layout provide the required three-foot wide clear access pathways <br />per Section 605.'1 1 of the California Fire Code, and is this shown on the roof plan? <br />Will the PV system be instailed on a roof having only one roofing layer with no <br />overlays? <br />Will the PV array be flush mounted to the existing roof so that the plane of the <br />modules (panels) are parallel to the plane of the roof? <br />Will the PV system weigh maxlmum 4 pounds per square feet or less? <br />Will the PV system be installed where the modules do not overhang any roof edges <br />(such as eaves, gabled ends, ridges and hips)? <br />Will the PV system be installed with a space of 2" minimum to l0" maximum between <br />the underside of modules and the surface of the roof? <br />Will the PV system be installed without using any ballast system or counter-weight <br />system? <br />Will the anchors be installed with a maximum horizontal anchor spacing of 6 feet <br />and is this maximum horizontal spacing shown on the plans? <br />Will the minimum 5/1 6" Iag screws be installed with a minimum ot 2-112 ioch <br />embedment into roof rafters (with pre-drilled holes) and is this minimum embedment <br />shown on the plans? <br />Are ALL the structural pages of the plans stamped and signed by a California <br />licensed professional engineer? (including project specific site plan, PV layout, <br />anchorage spacing, anchorage details and manufacturer's PV support information.) <br />2 <br />3 <br />YES NO <br />EU <br />mtr <br />Rtrqtr <br />Ktr <br />Rtr(u <br />(o <br />Qn <br />6,n <br />4 <br />5 <br />6 <br />7 <br />9 <br />10 <br />I certify under p <br />Print Name: K' <br />enalty of per,iury under the I aws of thQvtssq Rvsse <br />lifornia th e above is truee State of <br />Signature\r <br />phoneNumber: 4qq a8> SOa-l <br />Emait Address: KAw 692r. \fU S< CI t <br />Daie <br />()('..v-r {r-fn . O a-Y'L1 <br />\V <br />Rev 1 1/19/2015 <br />an-t)r-urufrn <br />. NAffi <br />1