Laserfiche WebLink
Planning & Building Agency <br />Building Safety Division <br />20 Civic Center Plaza <br />P.O. Box '1988 (M-19) <br />Santa Ana, CA 92702 <br />(7r4) 647-5800 <br />www.santa-ana.or9 <br />RESIDENTIAL <br />PHOTOVOLTAIC <br />CHECKLIST <br />soL{1 cBc 2016 <br />Solar Photovoltaic (PV) Checklist for Detached SINGLE FAIUIILY RESIDENCES Only <br />lnstructions: The licensed contractor of record shall complete all sections, answer the ten questions and <br />sign the certification section below. A copy ol this form shall be attached to each of TWO sets of plans, of <br />minimum 11" x 17" size. lf answerinq NO to any of the questions, plan check shall be required. <br />Proj ect Addross: 1 129 S CORTA DR <br />Contractor Company 1s66. Vivint Solar <br />Contractor License Number: 973756 <br />YES NO <br />1. trE <br />2 Etr <br />Are the following applicable to the propoaed project? <br />Will the PV syslem layout provide the required threo-foot wide clear access pathways <br />per Section 605.1 1 of the California Fire Code, and is this shown on the roof plan? <br />Will the PV system be installed on a roof having only one roofing layer with no <br />overlays? <br />Will the PV anay be flush mounled to the exisling roof so that the plane of the <br />modules (panels) are parallel to the plane of the roof? <br />Will the PV syslem weigh maximum 4 pounds per square feet or less? <br />Will the PV system be installed where the modules do not overhang any roof edges <br />(such as eaves, gabled ends, ridges and hips)? <br />Will the PV system be installed with a space of 2' minimum lo 10" maximum between <br />the underside of modules and the surface of the roof? <br />Will the PV system be installed wthout using any ballast system or counter-weight <br />system? <br />Will the anchors bs installed with a maximum horizontal anchor spacing of 6 fest <br />and is this maximum horizontal spacing shown on the plans? <br />Will the minimum 5/16'lag screws be installed with a minimum of 2-112 inch <br />embedment inlo roof rafters (with preirilled holes) and is this minimum embedment <br />shown on the plans? <br />Are ALL the structural pages of the plans stamped and signed by a Califomia <br />licensed professional engineer? (including project specific site plan, PV layout, <br />anchorage spacing, anchorage details and manufacture/s PV support information.) <br />I certlfy under penalty of periury under the laws of lhe State of California that the <br />Print Name: Kayla Horta Signature <br />Phone Number: 951 496-2292 <br />3 tr <br />tr <br />4 trDtrtr <br />trtr <br />Etr <br />6 <br />7 <br />8 <br />I trtr <br />10 atr <br />Revr 8/29/19 <br />9616-. O9lO4l20 <br />is true: <br />Email Address: kayla.horta@vivintsolar.com