Laserfiche WebLink
*-SANTA <br />NAJ,ffi <br />Planning E Building Agency <br />Building Saloty Division <br />20 Clvic Cenlor Plaza <br />P.O. Box 1988 (M-19) <br />Santa Ana, CA 92702 <br />(714) 6/17-5800 <br />www.santa-ana.org <br />RESIDENTIAL <br />PHOTOVOLTAIC <br />CHECKLIST <br />sol-01 cBc 2013 <br />Solar Photovoltaic (PV) Chccklisl tor Detached SINGLE FAMILY RESIDENGES Only <br />lnstructlons: The licensed contractor oI record shall complete all sections, answer the ten questions and <br />sign the cerlilication section below. A copy of this form shall be atlach6d to each of TWO sets of plans, of <br />minimum 1 1" x .17" size. lf answerlno NO to anv of the ouestlons. plan check shall be required. <br />Proisct Address:1918 N. WESTWOOD AVE, SANTA ANA, CA 92706 <br />Contractor Company Name: <br />Contractor License Number <br />SOUTHWEST SUN SOLAR, INC <br />1004667 <br />2 <br />3 <br />4 <br />5 <br />EO <br />Etr <br />6. Etr <br />?. atr <br />8. Etr <br />s. Eltr <br />YES NO6u <br />Etr <br />&tr <br />Are lhe following aPpllcablo to lho PtoPosBd proisct? <br />Will the PV system layout provide the rsquired three-fool wide clear access pathways <br />per Section 605. 1 1 of the Calilomia Fire Code, and is this shown on the roof plan? <br />Will the PV system be install€d on a roof having only one rooling layer with no <br />overlays? <br />Will the PV anay be flush mounl€d to the existing roof so that the plane of the <br />modules (panels) are parall€l to lhe plane of the roof.) <br />will the PV system weigh maximum 4 pounds Per square feet or less? <br />will the PV system be installed }rrhere the modules do not overhang any roof edges <br />(such as eaves, gabled ends, ridges and hips)? <br />Will lhe PV system b€ inEtallsd with a space of 2" minimum to 10' maximum belween <br />the underside o, modules and the surface of the roof? <br />Will the PV system be installed without uslng any ballast systom or counler-weight <br />systsm? <br />Will the anchors be installed lvith a maximum horizontal anchor spacing of 6 feet <br />and is this maximum horizontal spacing shown on the plans? <br />Will the minimum 5/'16' hg screws be installed with a minimum of 2'112 ind\ <br />embedmenl into roof raft€rs (with pre-dritled holes) and is lhis minimum embedment <br />shown on the plans? <br />Are ALL the structural pages of the plans wET stamPed and signed by a Califomia <br />licensed professional engineer? (including Pro.iect specific site plan, PV layout, <br />anchorage spacing, anchorage details and manufacture/s Br' support information.) <br />10 atr <br />I certify under penalty ot periury under the laws of the State of Cal ia that above is true; <br />Signature <br />Phone Number 714 582 3909 Date:I I <br />Email Address PERMIT@SOUTHWESTSUNSOLAR.COM <br />Revr 8/1712015 <br />pd61113ms. LONG NGOC LE