My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
20163779 - Permit
PBA
>
Building
>
Permits
>
C
>
Crystal Ln
>
3621 W Crystal Ln
>
20163779 - Permit
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/27/2021 9:03:13 AM
Creation date
5/27/2021 9:03:11 AM
Metadata
Fields
Template:
Permit
Permit Number
20163779
Full Address
3621 W Crystal Ln
Permit ID
232534
Master ID Number
2017-137654
Project Name
Miscellaneous Counter1 Permit
Street Number
003621
Street Direction
W
Street Name
Crystal
Street Suffix
Ln
Building Use Code
Resid-1 unit
Job Types
Solar
Permit Type
Electrical
Applied Date
7/27/2017
Issued Date
7/27/2017
Finalized Date
8/28/2017
Flood Zone
X-0602320256J
Description of Work
Install roof mounted pv solar panels. Per Expedited Permit Process For Pv Systems Standard String System. Fees paid on 10193639.
Nature of Work
Solar Panels
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
EXPEDITED PERMIT PROCESS FOR SMALL_SCALE PV SYSTEMS. STANDARD STRINC SYSTEM <br />The information in lhis guideline is inrended ro help local jUrisdictions and conrractors rdentrfy when PV sysrem insrallarions <br />are simplc. needing only a basic review and when a n installarion is more complex. It is :ikely ttrar 5,O % -75 % ol all residential <br />systerns will comply with these sirrple criteria. For projects lhat fail to nleet the simple cnteria. rcsclutian steps :tave been <br />suggested to provide as a path to permit approval. <br />Reqrired InJormation fot Pennit: <br />L Slre plan showing location o[ ma]or componenrs on the properry. This drawing need not be exacrly ro scale. bur ir <br />should represenr relarive locarion of components at site (see supplied example sire plan) PV arrays on dwellings <br />with a 3 perrmeter space at ridge and sides may not need separare hre service review. <br />2. Electrical dragram showing PV array conhgurarion. wrflng system, overcurrent protectlon. tnverter, disconnects, <br />required signs, and ac connection to buildlng (see supplied srandard elecrrical diagram) <br />3. Speci6cation sheets and installation manuals (il availabie) for all manufactured components including, but not <br />limired ro, PV modules, inverrer(s), combiner box disconnecis, and mounring sysrem. <br />Step 1 : Structura Review o[ PV Anay Mounting System <br />ls the aray to be mount€d on a dehne{ permiBed roof stru"tor.f df"" Eno <br />U No due to non-compliont roof or a ground mount. submit completed worksheet tor the structure WKSI <br />RooJ Injonnation: <br />1'lstheroolingtvpelightweight(Y,es:compoSilion'lighiweightmasonr},'meral,etc,.)- <br />IJ No, submit completed vorksheetJor roof sttucture l'd{St (No = hedvy mdsonr!, slate, etc. <br />2 Does the roo[ have a qrngle rooF .ovenng, Myes E no <br />IJ No, submit completed votksheet Jor rcof structure WKS L <br />3 Provrde merhod and rype ol weatherproofi ng rool penerrarrons (eg nashing, caulk)Flashing <br />M ouflting System InJonnation : <br />I . Is lhe mounting sLructure an ejrineered producr designed to mount PV mocules wirh no more rhan an 18" gap <br />beneah rhe modrle lrames?ll2l Ycs Ll No <br />IJ No, proeide d,etails of st"ucturq.l qttachment certiled W a design ptoJessional. <br />2. For manulactursd mounting systems. 6ll out informarion on the moun[ing sysrem below: <br />a. Mounting System N,lanufacrurer EgF-ggE!_Producr Name and Modelf Rocket <br />b. Total Weight of PV Modules and Rails <br />c Toml Nurroer oF Arrachment Points 22 <br />e Maximum Spaclng Betw-een Attachment Pornrs on a Rail <br />grearer than <br />a8 <br />45 lbs. see WKSI I <br />inches (see producr manuat for <br />maxirrum spacing allowed based on maximum desigr wind speed) <br />f Total Sllrface Area ol PV Modules (souare lEe:)246.5 <br />712.4 lbs <br />d. weight per Arrachmeil Poinr (b - c) 32.4 lbs 0f <br />g. Distribured Weighr of PV Module on Roof (b + fl 2.9 15y6,r <br />lf distribted, weight ol the Pv slstem k grcater tlan 5 lbste, see WKSI . <br />Step 2: Electrical Review of PV System (Calculations for Electrical Diagram) <br />ln ord€r for a Pv system to be considered for an expedlted permlr pmcess, rhe followlng must apply: <br />l. Pv modules, utiliry-interac ve invcrtcrs. and combrner boxes are identifred for use in PV sysrems. <br />2. The PV array is composed of 4 senes strings or less per inve er <br />3. The total inverter capacity has a continuous ac powcr ourput :1,440 Wafts or less <br />4 ' The ac inrerconnection point is on the load side of servjce disconnecring means (690.64(B)). <br />5. One ofthe s:andard eleclrical diagrams(El.l,El la.Et.lb.orEl.lc)canbeuscdLoaccuratelyrepresentthePV <br />system. Interactive PDF diagrams are avallable at wwwsolarabcs.org/permitring <br />Fill out the standard. electrical diagram completel! A guide to the ele rical diagram is proyideA b help the applicant <br />underctdnd each bldnk to lll in. II the electrical system iE more conplex than the stdndord clectricol diagram cdn elfectivel! <br />communicate, pro,Jide an alte|native diogrutn with aryropriate detdil. <br />2 EXPEDITED PTRMIT PROCISS FOR PV 5Y5TEM5
The URL can be used to link to this page
Your browser does not support the video tag.