Laserfiche WebLink
-,-SANTA <br />ANAqil$ <br />Planning & Building Agency <br />Building Safety Division <br />20 Clvic Center Plaza <br />P.O. Box 1988 (M-19) <br />Santa Ana, C492702 <br />(7r4) 647-5800 <br />www.santa-ana.org <br />RESIDENTIAL <br />PHOTOVOLTAIC <br />CHECKLIST <br />soL{1 cBc 2013 <br />Solar Photovoltalc (PV) Checklist for Detached SINGLE FAMILY RESIDENCES Only <br />lnstructions: The licensed contractor of record shall complete all sections, answer the ten questions and <br />sign the certification section below. A copy of this form shall be attached to each of TWO sets of plans, of <br />minimum 11" x 17" size. lf answering NO to any althe quegtlons,plan checl€hall be requ[9d. <br />Project Address:2727 W Camden Pl, Santa Ana, CA 92704, US <br />Contractor Company *".". Solar City <br />BBB I 04Contractor License Number: <br />2 <br />6 <br />7 <br />YES NOtrE <br />trtr <br />tro <br />4. Eltr <br />s. atr <br />trtr <br />@tr <br />I Eltr <br />o atr <br />10. El E <br />Are the followlng applicable to the proposed project? <br />Will the PV system layout provide the required three-foot wide clear access pathways <br />per Section 605.11 of the Califomia Fire Code, and is this shown on ths roof plan? <br />Will th€ PV system be inslalled on a roof having only one rooling layer with no <br />overlays? <br />Will the PV array be flush mounted to the existing roof so that the plane of the <br />modules (panels) are parallgl to the plane of the roof? <br />Will the PV system weigh maximum 4 pounds per square feet or less? <br />will the PV system be installed where the modules do not overhang any roof edges <br />(such as eaves, gabled ends, ridges and hips)? <br />Will the PV system be installed with a space of 2" minimum to 10' maximum between <br />the underside of modules and the surface of the roof? <br />Will the PV system be installed without using any ballast system or counter-weight <br />system? <br />Will the anchors be installed with a maximum horizontal anchor spacing of 6 feet <br />and is this maximum horizontal spacing shown on the plans? <br />Will the minimum 5/16" lag scrows be installed with a minimum ot 2-112 inch <br />embedment into roof rafters (with predrilled holes) and is this minimum emb€dment <br />shown on the plans? <br />Are ALL the structural pages of the plans WET stamped and sign€d by a Califomia <br />licensed professional engineer? (including prolect specific site plan, PV layout, <br />anchorage spacing, anchorage details and manufacturer's PV support information.) <br />lcsrtlfy under penalty of perjury undor the laws of the State of Californla <br />print Name: Daniel Wise Signatu <br />phone Number: 31 0.362.7551 <br />Emait Address: dwise@SOLARCITY.COM <br />R6v: &1712015 <br />Date:5//20t7 <br />t the above is true: