Laserfiche WebLink
-,,,SANTA <br />NAJI[if <br />Ef*ffSB,JR$;"qErr,.r, <br />20 Civlc Centar Phzt IF <br />PH <br />ESIDENTIAL <br />OTOVOLTAICP.O. Box 1988 (M-19) <br />Santa Ana, CA 92702 <br />JUN 08 i0r/ <br />(714) 6/t7-5800 <br />rvww.sa nta -a n a. o rg City of s"r,, <br />^n <br />CHECKLIST <br />sol-01 cBc 2013 <br />Solar Photovoltaic (PV) Checklist for Oetached SINGLE FAMILY RESIDENCES Only <br />lnsfuctions: The licensed contractor of record shall complete all sections, answer the ten questrons and <br />sign the certification section below. A copy of this form shall be attached to each of TWO sets of plans, of <br />minimum 1 1" x, 17" size. lf answerlnq NO to anv of the quegtiong. plan check shall b€ required. <br />P roj ect Address: 2028 E WELLINGTON <br />Contractor Company Name. ADVANCED IMPROVEi.4ENTS INC <br />contractor Licenae Number' 947761 <br />YES NO Are the following applicablo to tha proposed proiect? <br />Wll the PV system layout provide the required three-foot wide clear access pathways <br />per Section 605 11 of the Califomia Fire Code, and is this shown on the roof plan? <br />Will the PV system be installed on a roof having only one rooflng layer with no <br />overlays? <br />Will the PV anay be ffush mounted to the exisling rool so that the plane of the <br />modules (panels) are parallel to the plane of the roof? <br />Wll the PV system weigh maximum 4 pounds Per square feet or less? <br />Wll the PV system be installed where the modules do not overhang any roof edges <br />(such as eaves, gabled ends, ridges and hips)? <br />Wll the PV system be installed with a space of 2" minimum to 10" maximum between <br />the underside of modules and the surface of the roon <br />Wll he PV system be installed without using any ballast system or counter-weight <br />system? <br />Wll the anchors be installed with a maximum horizontal anchor spacing of 6 feet <br />and is this maximum horizontal spacing shown on the plans? <br />VMll the minimum 5/16'lag screws be installed with a minimum of 2-112 inch <br />embedment into ropf rafiers (with PIenrilled holes) and is this minimum embedment <br />shofln on the plans? <br />Are ALL the structural pages of the plans stamped and signed by a California <br />licensed professional engineer? (including project specif,c site plan, PV layout, <br />anchorage spacing, anchorage details and manuhctureds PV support information.) <br />Eltr <br />2 tr <br />tr <br />tr <br />tr <br />tr <br />3 <br />4 <br />5 E <br />6 <br />7 atr <br />8 u <br />I Eltr <br />10 E)tr <br />I certify under penalty of perjury under the laws of the State of California that the above is true: <br />pnnt Name: JASON HAYES Signature: _ <br />Phone Numbe. 714-630-661 1 <br />Emait Address: JASON@ADVANCED \,4p.COM <br />Rv 11i 192015 <br />Qslg 518117 ,/L <br />----l