Laserfiche WebLink
;#NIA <br />NA.'ffi <br />RESIDENTIAL <br />PHOTOVOLTAIC <br />CHECKLIST <br />sol,o1 c8c 2013 <br />Solar Photovoltaic (PV) Checktist for Detached STNGLE FAMILy RESIDENCES Only <br />lnstructions: The <br />sign the certificatio <br />minimum 1 '1" x 'l 7" <br />Proiect Address: <br />Contractor Company Name: <br />Contractor License Number <br />licensed contractor of record shall complete all sections, answer the ten questions and <br />n sec <br />size. <br />tion below. A copy of thts form shall be attached to each of TWO sets of plans. of <br />uired.lf answerin NO to an of the uestions lan check shall be re <br />Zzas u( <br />.4()c <br />2 <br />3 <br />YES,NOila <br />da <br />(a <br />Eo <br />EN <br />Eo <br />Eo <br />Es <br />Are the following applicable to the proposed project? <br />Will the PV system layout provide the required three-foot wide clear access pathways <br />per Section 605.11 of the California Fire Code, and is this shown on the roof plan? <br />Will the PV system be installed on a roof having only one roofing layer with no <br />overlays? <br />Will the PV array be flush mounted to the existjng roof so that the plane of the <br />modules (panels) are parallel to the plane of the roof? <br />Will the PV system weigh maxjmum 4 pounds per square feet or less? <br />Will the PV system be installed where the modules do not overhang any roof edges <br />(such as eaves, gabled ends, ridges and hips)? <br />Will the PV system be installed with a space of 2" minimum to i0,,maximum between <br />the underside of modules and the surface of the roof? <br />Will the PV system be lnstalled without using any ballast system or counter-weight <br />system? <br />Will the anchors be installed with a maximum horizontal anchor spacing of 6 feet <br />and is this maximum horizontal spacing shown on the plans? <br />Will the manimum 5/16" lag screws be installed with a minlmum ot 2-1lZ inch <br />embedment into roof rafters (with pre-drilled holes) and is this minimum embedment <br />shown on the plans? <br />Are ALL the structural pages of the plans stamped and signed by a California <br />licensed professional engineer? (including project speciflc site plan, pV layout, <br />anchorage spacing, anchorage details and manufacturer's pV support information.) <br />er p ury under the laws of the State of Califor <br />fe a*Signature <br />Date <br />4 <br />5 <br />6 <br />7 <br />tr <br />tr <br />M <br />tr <br />8 <br />I <br />10 <br />I certify und <br />Print Name: <br />c.hz>-, <br />(Cct <br />Rev 11/19/2015 <br />ena Ity of pe <br />d 35 3alqC. <br />at the ab <br />Plan ning E Building Agency <br />Building Safety Division <br />20 Civic Center Plaza <br />P.O. Box 1988 {tul.1 9 ) <br />Santa Ana, CA 92702 <br />(714) 647-s800 <br />www.sa nta-a na.org <br />Phone Number: <br />Emarl Address <br />,.-