My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
20163327 - Permit
PBA
>
Building
>
Permits
>
O
>
Orange Ave
>
2321 S Orange Ave
>
20163327 - Permit
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/27/2021 9:19:15 AM
Creation date
5/27/2021 9:19:14 AM
Metadata
Fields
Template:
Permit
Permit Number
20163327
Full Address
2321 S Orange Ave
Permit ID
230814
Master ID Number
2017-136557
Project Name
Miscellaneous Counter1 Permit
Street Number
002321
Street Direction
S
Street Name
Orange
Street Suffix
Ave
Building Use Code
Resid-1 unit
Job Types
Miscellaneous
Permit Type
Electrical
Applied Date
6/5/2017
Issued Date
6/5/2017
Flood Zone
X-0602320278J
Description of Work
handout given
Nature of Work
Service Meter
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
EXPEDITED PERMIT PROCESS FOR SMALL-SCALE PV SYSTEMS <br />STANDARD STRINC SYSTEM <br />The information in this guideline is intended to help local jurisdictions and contractors identifi/ when PV system installations <br />are simple. needing only a basic review and when an insEllation is more complex lt is likely rhat 50%-75% of all residenrial <br />systems will comply with these simple criteria. For proJects that fail to meet the simple criteria, resolution steps have been <br />suggested to provide as a parh to permit approval <br />Required InJormation for Permit: <br />I Site plan showing location of major components on the property. This drawing need not be exactly ro scale. bur ir <br />should represent relative location of components at site (see supplied example site plan). PV arrays on dwellings <br />with a 3 perimeter space al ridge and sides may not need seParate fire service review. <br />2 Electrical diagram showing PV array conhguration. wiring systern, overcurrenr proleclron, rnverte( disconnects, <br />required signs, and ac connection ro building (see supplied standard electrical diagram) <br />3 Specihcation sheets and insrallarion manuals (if available) For all manufacrured componenrs including. but nol <br />Iimited to, PV modules, inverter(s), combiner box, disconnects. and mounring system. <br />Step 1 : Structural Review o[ PV Array Mounting System <br />Is the array t! be mounted on a defrned, permitted roof structure? E y"" ! no <br />U No due to non-compliant rool or a ground mount. submit completed \,,/orhsheet Jor the structurc WKS L <br />Roof InJonnation: <br />I ls the roohng type Iightweight (Yes = composition, lighlweight masonry, metal, etc. .)YES <br />IJ No, submit completed norhsheet lor roof stucture WKSI (No = heeyy masonry, slete, etc . ) <br />2 Does the roof have a single roof coveringZ Eyes Eno <br />IJ No. submit completed worksheet Jor roof stucture WKSI . <br />I Provide method and type of wealherproofing roof penetrations (e g. flashing, caulk)Flashing, sealant <br />M ount in g Sy s t em lnlormat ion : <br />I ls lhe mounting structure an <br />beneath the module frames? <br />(ll ,neered product designed to mount PV modules with no more than an 18" gap <br />Yes tr No <br />If No, provide detaib of siucturol qltachment certified. by a design proJessional. <br />2 For manufactured mounring systems, frll out inlormation on rhe mounling system below <br />a. Mounting Sys rem Manufacturer ZeP Producr Name and Model# zs comP v4 <br />b. Total Weight of PV t\4odules and Rails 594 lbs <br />c Total Number of Attachment Points29 <br />Weight per Attachment Poinl (b + c)20.48 bs (if Urcarer rhan 45 lbs. see WKSI) <br />Maximum Spacing Belween Attachment Poinrs on a Rail 48 inches (see product manual for <br />maximum spacing allowed based on maximum design wind speed) <br />Total Surface Area of PV Modules (square feet)198 fr <br />Distributed Weight of PV Module on Roof (b + D 30 lbs/f[' <br />IJ distributed. wetght oJ the Pv system is greater than 5 lbstf . see WKSI. <br />Step 2: Electrical Review o[ PV System (Calculations for Electrical Diagram) <br />ln order for a PV system to be considered for an expedited permit process, tlle following must apply: <br />I PV modules. utility-interactive inverlers. and combiner boxes are identified for use in PV systems. <br />2 The PV array is composed of 4 series strings or less per invertel <br />3. The total invener capacity has a continuous ac power output 11,440 Watts or less <br />4 The ac interconnection point is on the load side of service disconnecting means (690.64(B)). <br />5. One of rhe standard electrical diagrams (El l. El.la. El.lb. or El.lc) can beused to accurately represent the PV <br />system. Interacrive PDF diagrams are available at www.solarabcs.org/permitting. <br />Fill out the stand.ard. electrical diogram completely. A guide to the electrical diagram is provided to help the arylicont <br />undet'stand edch blanh to jU in. lf the electical system is more complex than the standard electrical didgram cdn ellectively <br />communicate, provide an alternative diagram with appropriate detoil. <br />2 ExprDtrtD PERMIT PRocEss FoR pv sysrrMs <br />d <br />e <br />r <br />g
The URL can be used to link to this page
Your browser does not support the video tag.