Laserfiche WebLink
*-SANIA <br />NA,'ffi <br />Planning & Building Agency <br />Building Safety Division <br />20 Civic Center Plaza <br />P.O. Box 1988 (M-19) <br />Santa Ana, CA92702 <br />(714) 647-5800 <br />www.santa-a na.org <br />RESIDENTIAL <br />PHOTOVOLTAIC <br />CHECKLIST <br />soL-01 cBC 2013 <br />Solar Photovoltaic (PV) Checklist for Detached STNGLE FAMtLy RESTDENCES Onty <br />lnstructions: The licensed contractor of record shall complete all sections, answer the ten questions and <br />sign the certification section below. A copy of this form shall be attached to each of TWO sets of plans, of <br />minimum 11" x 17" size. lf answerin NO to anv of the oues tions, plan check shall be required. <br />Project Address:oh) <br />Contractor Company Name: <br />Contractor License Number:Tkso /o <br />2 <br />3 <br />YE$ NOEu <br />Es <br />Ku <br />Ea <br />Ku <br />tss <br />Eg <br />Are the following applicable to the proposed proiect? <br />Will the PV system layout provide the required three-foot wide clear access pathways <br />per Section 605.1 I of the California Fire Code, and is this shown on the roof plan? <br />Will the PV system be installed on a roof having only one roofing layer with no <br />overlays? <br />Will the PV array be flush mounted to the existing roof so that the plane of the <br />modules (panels) are parallel to the plane of the roof? <br />Will the PV system weigh maximum 4 pounds per square feet or less? <br />Will the PV system be installed where the modules do not overhang any roof edges <br />(such as eaves, gabled ends, ridges and hips)? <br />Will the PV system be installed with a space of 2" minimum to 10" maximum between <br />the underside of modules and the surface of the roof? <br />Will the PV system be installed without using any ballast system or counterweight <br />system? <br />Will the anchors be installed with a maximum horizontal anchor spacing of 6 feet <br />and is this maximum horizontal spacing shown on the plans? <br />Will the minimum 5/16" lag screws be installed with a minimum ol2-lt2inch <br />embedment into roof rafters (with pre-drilled holes) and is this minimum embedment <br />shown on the plans? <br />Are ALL the structural pages of the plans stamped and signed by a California <br />licensed professional engineer? (including project specific site plan, pV layout, <br />anchorage spacing, anchorage details and manufacturer's pV support information.) <br />6/L <br />4 <br />6 <br />7 <br />hs <br />Etr <br />B <br />9 <br />Print Name: C <br />Rev 11/19/2015 <br />10 Ftr <br />I certify under penalty of periury under the laws of the State of California that the ab <br />rrl e Signature <br />Date:Phone Number: 7/{-- 21/ <br />Email Address: C o E C <br />is true: