Laserfiche WebLink
,^-SNTA <br />NA <br />[t\1\c <br />tBuuft[ <br />lcwl <br />Planning & Building Agency <br />Building Safety Division <br />20 Civic Center Plaza <br />P.O. Box 1988 (M-19) <br />santa Ana, cA 92702 <br />(714) 647-5800 <br />w\ rw.santa-ana.org <br />SOL 01 CBC 2013 <br />Solar Photovoltaic (PV) Checklist for Oetached SINGLE FAMILY RESIDENCES Only <br />lnstructions: The licensed contractor of rccord shall comdete all sections, answer the ten questions and <br />sign the certification section below. A copy of this form shall be attached io each of TWO sets of plans, of <br />minimum '1 1 'x 17" size. lf answerino NO to anv of the oues ons. olan check shall be reouired. <br />RESIDENTIAL <br />PHOTOVOLTAIC <br />CHECKLIST <br />Proiect Address:u2luJ <br />^t <br />rtle St qJ70 <br />Contractor Company 1136s. STAR SUN SOLAR <br />Contractor Liconae Number: i CCE 302 <br />YES NO Aro the following applicable to the proposed proJect? <br />Will the PV system layout provide the equired three-foot lvide clear access pathways <br />per Section 605.1 1 of the California Fire Code, and is this shown on the roof plan2 <br />Wll the PV system be installed on a roof having only one ioofing layer with no <br />overlays? <br />Wll the PV array be flush mounted to he existing roof so that the plane of the <br />modules (panels) are parallel to the plane of the root? <br />Wll the PV system weigh maximum 4 pounds per square feet or less? <br />Wll the PV system be installed where the modules do not o\erhang any roof edges <br />(such as eaves, gabled ends, ridges and hips)? <br />Will the PV system be installed with a space of 2" minimurn to 10" maximum between <br />the underside of modules and the surface of the roof? <br />Will the PV system be installed vr'ithout using any ballast system or counter-weight <br />system? <br />Wll the anchors be installed wilh a maxilum horizontal anchor spacing of 6 feet <br />and is this maximum horizontal spacing shown on the plans? <br />Wll the minimum 5/16" lag screws be installed with a mininlum ol2-'l12 inch <br />embedment into roof rafters (with pre-drilled holes) and is this manimum embedment <br />shown on the plans? <br />Are ALL the structural pages of the plans WET stamped and signed by a California <br />licensed professional engineer? (including ploject specific site plan, PV layout, <br />anchorage spacing, anchorage details and manufacturer's PV support information.) <br />trtr <br />2 <br />3 <br />4 <br />5 <br />trtr <br />trtr <br />6 Btr <br />trD <br />trtr <br />EtrI <br />10 trtr <br />I certify under penalty of periury under the laws of the Stata of Cal <br />Print Name: STAR SUN SOLAR Srgnature <br />Email Address <br />n lc. Ano <br />tr <br />D <br />E <br />7 <br />I <br />Phone Number: (711) 530-8771 <br />x <br />Rev:6/1712015 <br />Date b6/tbt t7 <br />the above is true: <br />1