Laserfiche WebLink
.--SANTA <br />NAJfiiil <br />Planning & Building Agency <br />Building Safety Division <br />20 Civic Center Plaza <br />P.O. Box 1988 (M-19) <br />Santa Ana, C492702 <br />(7'14) 647-5800 <br />www,santa-ana.org <br />RESIDENTIAL <br />PHOTOVOLTAIC <br />CHECKLIST <br />sol-01 cBc 2013 <br />Solar Photovoltaic (PV) Checklist for Detached SINGLE FAMILY RESIDENCES Only <br />lnstructions: The licensed contraclor of record shall complete all sections, answer the ten questions and <br />sign the certification section below. A copy of this form shall be attached to each of TWO sets of plans, of <br />manimum 1 1" x 17" size. lf answerinq NO to anv of the q uestions, olan check shall be required. <br />4 <br />5 <br />Project Address:\ro> N $S^i <br />contractor company tlame: 1r--ct (t^',". <br />contractor License Number: 1tO\n\ <br />YES NO Are the following applicable to the proposed project? <br />Will the PV system layout provide the required three-foot wide clear access pathways <br />per Section 605.'11 of the California Fire Code, and is this shown on the roof plan? <br />Will the PV system be installed on a roof having only one roofing layer with no <br />overlays? <br />Will the PV array be flush mounted to the existing roof so that the plane of the <br />modules (panels) are parallel to the plane of the roof? <br />Will the PV system weigh maxamum 4 pounds per square feet or less? <br />Will the PV system be installed where the modules do not overhang any roof edges <br />(such as eaves, gabled ends, ridges and hips)? <br />Will the PV system be installed with a space of 2" minimum to 10" maximum between <br />the underside of modules and the surface of the roof? <br />tr <br />trtr <br />9 <br />tr Will the PV system be installed without using any ballast system or counter-weight <br />system? <br />tr Will the anchors be installed with a maximum horizontal anchor spacing of 6 feet <br />and is this maximum horizontal spacing shown on the plans? <br />tr Will the minimum 5/16" lag screws be installed with a minimum ot 2-112 inch <br />embedment into roof rafters (with pre-drilled holes) and is this minimum embedment <br />shown on the plans? <br />tr Are ALL the structural pages of the plans stamped and signed by a California <br />licensed professional engineer? (including project specific site plan, PV layout, <br />anchorage spacing, anchorage details and manufacturer's PV support information.) <br />2 <br />3 <br />6 <br />7 <br />8 <br />b <br />E <br />tr <br />N <br />'E <br />'! <br />tr <br />tr <br />D <br />tr <br />o <br />10. <br />lcertify under pjjlalty of pellu <br />Print Name: \(r.\" \1 <br />ry under^he laws of th <br />4,.<f <br />^,) <br />e State of California that the above is true: <br />Phone Number: \\\' <br />Email Address <br />Rev 11/19/2015 <br />1 S\.$ j \L <br />Signature: <br />Date: L <br />1. <br />a? <br />\