My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
20163529 - Permit
PBA
>
Building
>
Permits
>
C
>
Corta Dr
>
625 S Corta Dr
>
20163529 - Permit
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/27/2021 9:19:36 AM
Creation date
5/27/2021 9:19:35 AM
Metadata
Fields
Template:
Permit
Permit Number
20163529
Full Address
625 S Corta Dr
Permit ID
231407
Master ID Number
2017-136908
Project Name
Miscellaneous Counter1 Permit
Street Number
000625
Street Direction
S
Street Name
Corta
Street Suffix
Dr
Building Use Code
Resid-1 unit
Job Types
Solar
Permit Type
Electrical
Applied Date
6/20/2017
Issued Date
6/20/2017
Finalized Date
7/21/2017
Flood Zone
A-0602320256J
Description of Work
Install pv roof mounted solar panels. Per Expedited Permit Process For PV Systems Micro-Inverter. Fees paid on 10193308.
Nature of Work
Solar Panels
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
EXPEDITED PERMIT PROCESS FOR SMALL.SCALE PV SYSTEMS <br />MICRO-INVERTER <br />The information in this guideline is intended to help local jurisdic(ions and conrracrors idenrify when pv sysrem insrallarions <br />are simple, needing only a basic review and when an installation is more complex. Ir is likely thar 50 % -75% of all residenrial <br />systems will comply with lhese simple criteria. For proJects thar fail to meer the simple criteria. resolution steps have been <br />suggested to provide as a parh ro permir approval. <br />Requited Infomatiotl lor Permit: <br />I Site plan showing location of major components on the property. This drawing need nor be exacrly ro scale. bur ir <br />should represenr relarive locarion of componenrs ar site (see supplied example sire plan). pV arrays on dwellings <br />with a S perimeter space at ridge and sides may not need separate hre service review. <br />2 Electrical diagram showing PV array configuration, wiring system, overcurrent protection. inverter. disconnects. <br />required signs, and ac connecrion ro building (see supplied srandard elecrrical diagram). <br />3. Specihcation sheers and inshllation manuals (if available) for all manufactured components including, but nor <br />Iimited to. PV modules. inverrer(s). combiner box. disconnects, and mounting sysrem. <br />Step 1 : Structural Review o[ PV Anay Mounting System <br />ls the array to be mounted on a defrned, permitted rcof sructurc? Eyes Effo <br />I No due to non-compliant rool or a ground. mount. submit completed worksheet lor the structure wKSl . <br />RooJ InJormation: <br />l. Is the roofing rype lighrweighr ryes = composirion. lighrweighr masonry meral. erc. .)Yes <br />IJ No, submit completed worhsheet jor roof stucture WKSI (No = heavy masonry, slate, etc. . .) <br />2. Does the roof have a single roof covering? Elye" !No <br />II No, submit completed worksheet Ior rool structure WKSI. <br />3. Provide method and rype of wearherproofrng roof penerrarions (e.9. flashing, caulk)F lashing <br />M ounting Sy st em Inforlnation : <br />L Is the mounting srructure an <br />beneath the module frames? <br />en ineered producr designed to mount PV modules with no more rhan an I8 gap <br />Yes tr No <br />U No, provide details oJ stuctural attachmmt cerdrted by a design proJessionat. <br />2. For manufacrured mounting systems, hll out information on the mounting system below <br />a. Mounring system Manufacturer SWH producr Name and Mo6"lxSolar Mount <br />b. Total Weigh t of Pv Modules and Rails 1104 lbs <br />c. Total Number of Attachment Poinr 38 <br />d Weighr per Arrachmenr Poinr (b + c)29.0s bs (if greater than 45 lbs, see WKS I ) <br />e Maximum Spacing Between Attachmenr Points on a Pail 72 rnches (see producr manual for <br />maximum spacing allowed based on maximum design wind speed) <br />f. Toul Surface Area of PV Modules (square feer)423.58 fr'] <br />g. Distribured Weighr of PV Module on Roof (b + l)2.62 lbs/ft'? <br />II distributed weight of the PV rystem is greater than 5 lbste , see Wt<51 . <br />Step 2: Electrical Review o[ PV System (Calculations lor Electrical Diagram) <br />In order for a PV s!.stem b be considered for an expediEd permlt pmcess, the fofiowing must apply: <br />l. PV modules, urility-interactive inverlers, and combiner boxes are identihed for use in pV systems. <br />2. The PV array is composed of 4 series strings or less per invener. <br />3. The toral inverter capacify has a continuous ac power output l i,44O Watts or less <br />4. The ac interconnection poinr is on the load side of service disconnecring means (690.64(8)). <br />5. one of the sundard electrical diagrams (E L I . E L I a. E I I b, or E L I c) can be used to accurately represenr rhe pV <br />system. Interactive PDF diagrams are available at www.solarabcs.org/permifting. <br />Fill out the standdrd electrical diagram completely. A guide to the electricot diagram is provided to help the appticant <br />understand each blanh to ill in. If the electrical q/stan is more complex than the standard etectrical diag:ram can ellectiyely <br />communicate, provide an alternatiye diagram with aryropiate detail. <br />2 lXPEDITED PERMIT PROCESS FOR PV SYSTEMS - MICRO-INVERTER
The URL can be used to link to this page
Your browser does not support the video tag.