Laserfiche WebLink
Plrnnlng & Bulldlng Agency <br />Bulldlng Srf.ty Dlviiion <br />20 CMc Conter Plazs <br />P.O. Box 1988 ( -19) <br />Santa Ana, CA92702 <br />(71,0) 047-5E00 <br />wtw,3rnt!.!na.org <br />RESIDENTIAL <br />PHOTOVOLTAIC <br />CHECKLIST <br />soL41 CBC 2013 <br />Solar Photovoltalc (PV) Checklist for Detached SINGLE FAMILY RESIDENCES Only <br />lnstructlons: Th6 licensed contractor of record shall complete all sections, answ€r the ten questions and <br />below. Acopyof this form shall be attached to each of TWO sels of plans, ofsign the certification section <br />mf nimum 11" x 17" size. lf a nswerlnq NO to any of the q ons. Dlan check shall be reoulred, <br />"1425 Sharon Rd., Santa Ana, CA 92706ProJect Addrese: <br />Cont actor Company n".". SolarCity <br />. 888104 <br />2 <br />4 <br />Contractor Llcense Number <br />YES NO <br />EI tr <br />Eltr <br />e. trtr <br />10. ED <br />atr <br />oEr <br />Eltratr <br />Ela <br />au <br />Are the tollowlng appllcablo to tho proposed project? <br />Will the PV system layoul provide the required threa'foot wide clear access pathways <br />per Section 605.11 of the Califomia Fire Code, and is this shown on the roof plan? <br />Will the PV system b6 installed on a roof having only one roofing layer with no <br />ovedays? <br />Will the PV anay be flush mounted to the existing roof so that the plane of the <br />modules (panels) are parallel to the plano of the roof? <br />Will the PV system weigh maximum 4 pounds per square feet or less? <br />Will the PV system bo installed whers the modules do nol overhang any roof edges <br />(such as eaves, gabled ends, ridges and hips)? <br />Will th€ PV system be installed with a space of 2' minimum to 10" maximum between <br />the undorside of modules and the surface of the roof? <br />will the PV system be installed without using any ballast system or counter-weight <br />system? <br />Will the anchors be installed with a maximum horizontal anchor spacing of 6 feet <br />and is this maximum horizontal spacing shown on the plans? <br />Will th6 minimum 5/16" lag scrows be installed with a minimum o12-112inch <br />ombedment into roof rafters (with preirilled holes) and is this minimum embedment <br />shown on the plans? <br />Are ALL the structural pages of the plans WET slamped and signod by a Califomia <br />licens€d professional engineer? (including project specific site plan, PV layout, <br />anchorage spacing, anchorage d€tails and manufacturer's PV support information.) <br />6 <br />7 <br />o <br />I certlly under penalty ot p€riury under the law3 of tho State of Callfornla that th. above ls tru.: <br />Nathan Sterk lll'li,if,;.,?')llliri,';i'),,, <br />phone Number: 480.553.8'l 34 <br />Email Address: <br />Rov: &1712015 <br />nsterk@solarcity..com <br />Dar' 4/24/t7 <br />-,-SANTA <br />NAJIiilil <br />print Name: Nathan Sterk Signature: