Laserfiche WebLink
Plannlng & Bullding Agsncy <br />Buildlng Safety Dlvision <br />20 Clvic Center Plazs <br />P.O. Box 1988 (M-19) <br />Sania Ana, CA92702 <br />(714) 647-5800 <br />www,santa.ana.org <br />RESIDENTIAL <br />PHOTOVOLTAIC <br />CHECKLIST <br />sol{1 cBc 2013 <br />Solar Photovollaic (PV) Checklist for Detached SINGLE FAMILY RESIDENCES Only <br />lnstructions: The licensed contractor of record shall completa all sections, answer the ten questions and <br />sign the certification section below. A copy of this form shall be attached to each of TWO sets of plans, of <br />minimum 11" x 17" size. lf answerinq NO to any ofthe questlons, plan check 6hall be requlred. <br />ProJect Address:309 Juniper Ave, Santa Ana, CA 92707, US <br />Contraclor Company 0,1".". Solar CitY <br />Contractor Llcense Number . 8BBl04 <br />YES NO Are the followlng appllcable to the proposod project? <br />Will the PV system layout provide the required three-foot wido clear access pathways <br />per Section 605.1 1 of the California Fire Code, and is this shown on the roof plan? <br />Will the PV system be installed on a roof having only one roofing layer with no <br />overlays? <br />Will the PV array be flush mounted to the existing roof so that the plane of the <br />modules (panels) are parallel to the plane of the roof? <br />Will the PV system weigh maximum 4 pounds per square feet or less? <br />Will the PV system be installed where the modules do nol overhang any roof edges <br />(such as eaves, gabled ends, ridges and hips)? <br />Will the PV system be installed with a space of 2'minimum to 10" maximum between <br />the underslde of modules and the surface of the roof? <br />Will the PV system be installed without using any ballast system or counter-weight <br />system? <br />Will the anchors be installed with a maximum horizontal anchor spacing of 6 feet <br />and is this maximum horizontal spacing shown on the plans? <br />Will the minimum 5/16" lag screws be installed with a minimum ol 2-112 inch <br />embedment into roof rafters (with pre-drilled holes) and is this minimum embedment <br />shown on the plans? <br />Are ALL the structural pages of the plans WET stamped and signed by a Califomia <br />licensed professional engineer? (including proiect specific site plan, PV layout, <br />anchorage spacing, anchorage d€tails and manufacturer's PV support information.) <br />1 EI E <br />2 trtr <br />@tr <br />trtratr <br />@tr <br />@u <br />4 <br />5 <br />6 <br />7 <br />8 Eltr <br />Eltr <br />10. @E <br />I certity under penalty of porjury undor the laws of the State of rnla that the above Is lrue: <br />print Name: DAI YIN Signature <br />phone Number: 5593540716 <br />Email Address: DYIN@SOLARCITY.COM <br />Rov: 8/17/20'15 <br />Dar6. 6/27 /2Ol <br />9.