My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
20163131 - Permit
PBA
>
Building
>
Permits
>
G
>
Gates St
>
910 N Gates St
>
20163131 - Permit
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/27/2021 10:26:11 AM
Creation date
5/27/2021 10:26:10 AM
Metadata
Fields
Template:
Permit
Permit Number
20163131
Full Address
910 N Gates St
Permit ID
229957
Master ID Number
2017-135976
Project Name
Miscellaneous Counter1 Permit
Street Number
000910
Street Direction
N
Street Name
Gates
Street Suffix
St
Building Use Code
Resid-1 unit
Job Types
Solar
Permit Type
Electrical
Applied Date
5/4/2017
Issued Date
5/4/2017
Finalized Date
7/10/2017
Flood Zone
A-0602320143J
Description of Work
Install roof mounted PV panels. Per Expedited Permit Process For PV Systems Standard String System. Fees paid on BP #10192891.
Nature of Work
Solar
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
. EXPEDITED PERMIT PROCESS FOR SMALL-SCALE PV SYSTEMS <br />STANDARD STRING SYSTEM <br />The information in this guideline is intended to help local Jurisdicrions and contractors identify when PV system installaoons <br />are simple, needing only a basic review, and when an insrallarion is more complex. lt is likely that 50%-75% of all residential <br />systems will comply with these simple criteria For projects rhat fail to meer the srmple criteria. resolution steps have been <br />suggested ro provide as a path ro permit approval. <br />Requtred InJofination for Pennit : <br />I Site plan showing location of ma.1or componen(s on the property This drawing need not be exactly to scale. but it <br />should represent relative location of components at site (see supplied example site plan). PV arrays on dwellings <br />with a 3 perimeter space at ridge and sides may not need separare hre service review <br />2 Electrical diagram showing PV array conhguration. wiring sysrem. overcurrent protection, inverter. disconnects. <br />required signs, and ac connection to building (see supplied srandard elecrrical diagram). <br />5. Specincarion sheets and installation manuals (if available) for all manufactured components including, but not <br />limited to. PV modules, inverrer(s), combiner box, disconnects, and mounting system. <br />Step 1 : Structural Review of PV Array Mounting System <br />ls the array to be mount€d on a defrned, permitted roof structure? Ev.s Euo <br />U No due to non-compliant rool or a ground mount, submtt completed worhsheet Jor the structure WKSI. <br />Roof Infofinntion: <br />l ls the roohng type lightweight (Yes = composiron, lighlweight masonry. nletal, etc ) <br />f No, submit completed worksheetjor rooJ structure Wllsl (No = heavy masonry. sldte. etc .) <br />2. Does rhe roof have a single roof coveringZ EIVes !Uo <br />IJ No, submit completed worhsheet Jor rooJ structure WKSI. <br />f. Provide merhod and rype of wearherproohng roof penetrarions (e g flashing, caulk)Flashing <br />M oun ting Sy s t em Informati on : <br />l. ls the mounting structure an <br />beneath the module lrames? <br />en neered producr designed ro mounr PV modules with no more than an l8 gap <br />Yes No <br />IJ No. provide d.etails oJ structural attachment certiled by a design prokssional. <br />2. For manuFacrured mounting systems, frll our rnformalion on the mounting system below <br />a Mounttnp Svs(en] N4anulacturer sunpower producr Name and Model# lnvisiMount <br />b. Total weight of PV Modules and Rails 1130 lbs <br />c Total Number of Atrachmenr Points 60 <br />d. Weight per Attachment Point (b + c)19 bs (if greater than 45 lbs. see wKS I ) <br />e Maximum spacing Between Alrachment Points on a Rail 48 rnches (see product manual for <br />maximum spacing allowed based on maximum design wind speed) <br />f Total Surface Area of Pv Modules (square feet)414 Fr: <br />Drsrribured Werghr of PV l\,lodule on Rool (b + 0 2.8 lbsi lrJ <br />IJ distributed weight of the PV slstem is greater than 5 lbstf , see WNSI . <br />Step 2: Electrical Review o[ PV System (Calculations for Electrical Diagram) <br />In order for a Pv system to be considered for an expedited permit process, the following must apply: <br />l. PV modules. utility-interacrive inverters. and combiner boxes are identified for use in PV systems. <br />2. The PV array is composed of 4 series strings or less per inverter <br />f. The rotal inverter capacity has a continuous ac power output 13.440 Watts or less <br />4. The ac inrerconnection point is on rhe load side of service drsconnecting means {690.64(B)). <br />5. One ofthe sEndard electrical diagrams(El.l. E1.la, El.lb.orEl lc) can beused to accurately represent the PV <br />sys(em. lnreractive PDF diagrams are available at wwwsolarabcs.org/permitting. <br />Fill out the standard electrical diagram completely. A guide to the electrical diagram is provided to help the arylicant <br />understand each blank tolU in. U the electrical system is more complex than the standard electrical diagram can elfectively <br />communicate, provide an slternative diagram with aryropriate detail. <br />2 FxpEDrrFD I'ERMrr PRocEss FoR PV sysrFMs <br />Yes, Composition
The URL can be used to link to this page
Your browser does not support the video tag.