My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
20163154 - Permit
PBA
>
Building
>
Permits
>
G
>
Greenbrier St
>
2606 N Greenbrier St
>
20163154 - Permit
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/27/2021 10:26:15 AM
Creation date
5/27/2021 10:26:14 AM
Metadata
Fields
Template:
Permit
Permit Number
20163154
Full Address
2606 N Greenbrier St
Permit ID
230075
Master ID Number
2017-136054
Project Name
Miscellaneous Counter1 Permit
Street Number
002606
Street Direction
N
Street Name
Greenbrier
Street Suffix
St
Building Use Code
Resid-1 unit
Job Types
Solar
Permit Type
Electrical
Applied Date
5/9/2017
Issued Date
5/9/2017
Finalized Date
7/31/2017
Flood Zone
X-0602320144J
Description of Work
Install new 6.600 kw roof mounted solar PV system (22 panels) ALL FEES PAID ON 10192933
Nature of Work
Solar
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
EXPEDITED PERMIT PROCESS FOR SMALL-SCALE PV SYSTEMS <br />STANDARD STRING SYSTEM <br />The information in this guideline is intended ro help local jurisdicrions and conrracrors idenrify when pV sysrem insrallations <br />are simple, needing only a basic review and when an insEllation is more complex. Ir is likely rhar 50%-75% of all residenLial <br />systems will comply with these simple criteria. For projects that fail to meet the simple crireria. resolurion sreps have been <br />suggested to provide as a parh ro permir approval. <br />Required Infonnatioi for Pemit: <br />l. Site plan showing location of major componenrs on rhe properry. This drawing need nor be exacrly ro scale, but it <br />should represenr relative location of components at site (see supplied example site plan). pV arrays on dwellings <br />with a 3'perimeter space at ridge and sides may not need separate hre servtce review <br />2. Elecrical diagrarn showing PV array configuration, wiring system, overcurrenr prorection, inverter, disconnects, <br />required signs, and ac connection to building (see supplied standard elecrrical diagram). <br />3. SPecincation sheets and insnllation manuals (if available) for all manufactured componenrs including, but not <br />limited to, PV modules, inverter(s), combiner box. disconnec(s, and mountrnq sysrem h <br />Step 1 : Structural Review o[ PV Array Mounting System l( <br />Is the array to be mounted on a defined, permitted roof structure? Ev." Eno <br />D-,^'-o <br />I No due to non-compl <br />Roof Information: <br />I ls the roohng <br />iant roo.l or a qround mount . submit completed worhsheet for the sftucture WKS I .ky' y <br />02 <br />type lightweighr (Yes = composirion. lighrweighr masonry. meral. erc ) <br />IJ No, submit completed worhsheet Jor rooJ structure WNSt (No = heayy masonry. slate, etc...) <br />2. Does rhe roof have a single roof coveringl Eyes ! no <br />IJ No. submit completed worksheet Jor roof structwe WKSI. <br />3 Provide method and type of wearherproohng roof penetrarions (eg flashing, caulk)Flashing and caulk <br />Mounting Sy sten Information : <br />I ls the mounting structure an <br />beneath the module frames? <br />en ineered product designed ro mounr PV modules wirh no more than an l8 ' gap <br />II No, provide detaik of s uctural attachment cefiijed by a design proJessional. <br />2. For manuractured mounring sysrems, hll out informarion on the mounrrng sysrem below <br />a. Mounring Sy stem Manufacturer lronridge producr Name and 14o6.;3 XRl0 Rail <br />b Total weig ht of PV N4odules a16 P11r 998.45 lbs <br />c. Total Number of Attachment Poin 37 <br />,,, <br />4 <br />Yes No <br />PLBG <br />ERM rYP <br />ft <br />d <br />e <br />f <br />g <br />Weight per Attachment Poinr (b + c)26 <br />Maximum Spacing Between Arrachment Points on a <br />maximum spacing allowed based on ma xt ntu rg <br />Total Surface Area of PV Modules (square r) <br />lbs (if reat <br />f <br />f'unrur <br />ro, <br />IDistributed weight of PV Module on Roof (bI0 2.524 lbs/tu: <br />If distributed weight of the PV system is greater thdn 5lbs/jt?, s"e WRS1. <br />Step 2' E <br />ln order fo <br />lectrical Review o[ PV System (Calculati on s for Electrical Diagram) <br />r a PV system to be considered for an expedited permit prccess, the following must appl <br />PV modules. utility-interactive inverters, and combiner boxes are identihed foa use tn PV sysrem <br />The PV array is composed of 4 series strings or less per inverter <br />The total inverrer capaciay has a continuous ac power outpur 13,440 Wat'ts or iess- - <br />The ac interconnecrion poinr is on rhe load side of service disconnecring means (690-64(8), <br />One of the standard electrical diagrams(ELl. El.la. El.Ib. or El I c) can be used o acciria <br />system. lnteractive PDF diagrams are available at www.solarabcs.org/permitring. <br />Fill out the standard electrical diagrom completely A guide to the electric^l diagram is <br />understand each blank to ill in. U the electrical system is mot'e complex than the standard electrica <br />communicate, provide an alternative diagram with appropriate detaiL <br />2 ExpEDrrED PERMIT PRocESs ion pv svsrrr"ls <br />I <br />2 <br />3 <br />4 <br />5 <br />s. <br />-) <br />l\a <br />he PV <br />I <br />eLfecti,ely
The URL can be used to link to this page
Your browser does not support the video tag.