Laserfiche WebLink
The Solar America Board for Codes and Standards (Solar ABCS) Expedited permir pro- <br />cess provides a means ro differentiate systems that can be permitted quickly and easily <br />due to their similarity wirh the majority of small-scale PV systems. Those sysrems wirh <br />unique characteristics may be handled with small additions to this Expedited permir <br />Process or may require much more information, depending on the uniqueness of the <br />installation. <br />The following pages contain forms for the Micro.lnverter to use with rhe Expedited per- <br />mit Process. The Standard Srring, AC Module, and Supply-Side Connecrion forms <br />are also available as interactive PDF files at www.solarabcs.org/permitting. In jurisdic- <br />tions that have adopted the Expedited Permit Process for PV Sysrems, rhese forms can <br />be filled out electronically and submitted in either prinred form and via email. An elec- <br />tronic format is used so that the supplied informarion is standardized and legible for rhe <br />local jurisdiction. <br />R <br />D c t I v ED <br />llAY 11 2011 <br />Ci! of SantaAna <br />)ot<.ar?o'1 L <br />EXPEDITED PERMIT PRoCESS FoR PV SYSTEMS - MICRo-INVIRTERI <br />EXPEDITED'PERMIT PROCESS FOR PV SYSTEMS <br />MICRO.INVERTER