My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
20170586 - Permit
PBA
>
Building
>
Permits
>
H
>
Harbor Blvd
>
522 S Harbor Blvd
>
20170586 - Permit
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/27/2021 11:09:20 AM
Creation date
5/27/2021 11:09:19 AM
Metadata
Fields
Template:
Permit
Permit Number
20170586
Full Address
522 S Harbor Blvd
Permit ID
262268
Master ID Number
2020-157069
Project Name
Miscellaneous Counter1 Permit
Street Number
000522
Street Direction
S
Street Name
Harbor
Street Suffix
Blvd
Building Use Code
Resid-1 unit
Job Types
Solar
Permit Type
Electrical
Applied Date
1/14/2020
Issued Date
1/14/2020
Finalized Date
1/21/2020
Flood Zone
X-0602320256J
Description of Work
Install roof mounted solar panels. Per Expedited Permit Process For Small Scale PV Systems Standard String System. All fees paid on 101102841.
Nature of Work
Solar
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
. EXPEDITED PERMIT PROCESS FOR SMALL-SCALE PV SYSTEMS <br />STANDARD STRING SYSTEM <br />The info?mation in rhis Euideline is intended to help localjurisdic ons and contractors identify when PV system installations <br />are simple, needing only a basic review and when an insrallation is more cornplex. Ir is likely that 50 % -75% of all <br />systems will cornply wirh these sirnplc criteria. For projects that fail ta <br />;leI <br />teria. resol st h <br />suggested to provide as a path to permit approval <br />Reguircd Infornntion for Petmit: <br />l Site plan showing location o[ major components on the ptup need not be exacrly to scale, buL il <br />should represent relative location of coinponents at site (see.suppl led exarnple.site plan). PV arrays on dwellings <br />with a 3' peflmeter space at ridge and sides may not need separate hre servtce revtew. <br />2. Electrical diagram showing PV array conflguration.o ne <br />required signs. and ac connection to building (see <br />5. Specification sheets and installalion manuals (if av not <br />limited to, PV modules, inverter(s), combiner box, <br />Step1:StructuralReviewo[PVAr,ayN4ountingSystem,,'-... <br />Is the array to be mounted on a defined, permitted rcof structure? EIy"" Elno <br />l.f No due to non-compliant roof ar a ground mount. submit completed worhsheet ror the structure wl<51 <br />RooJ InJormatiort: <br />I Is rhe roohng rype lighrwcight (Yes = composition, lightweight masonry, metal, etc...)Yes= Standard Weight <br />I 1/2 and 12 pounds per square foot <br />b. Total Weight of PV Mod u1s5 3n6 62115 717-60 lbs <br />c. Total Number of Attachment Poin ,.32 <br />d <br />e <br />Weight per Attachment Point (b + c)22.43 lbs (if grearer than 45 lbs, see WKS I ) <br />Maximum Spacing Berween Atachmenr Points on a nait 48 inches (see product manual for <br />maximum spacing allowed based on maximum design wind speed) <br />f. <br />g <br />Total Surface Area of PV Modules (square feet)334.57 ft' <br />Distributed Weight of PV Module on Roof (b + l)lbs/ft: <br />U distributed weight of the Pv syst€m is greater than 5 lbstf , see WRS1. <br />Step 2: Electrical Review o[ PV System (Calculations for Electrical Diagram) <br />In order for a Pv system to be consldercd for an expeditrd permit process, the followinEl must apply: <br />l. PV modules, utiiity-interactive inverrers, and comtiner boxes are identined for use in PV systems. <br />2. The PV array is composed o[ 4 series strings or less per inverter. <br />3. The total inverter capacity has a continuous ac power output 13,440 watts orless <br />4. The ac interconnection point is on the load side oF service disconnecting means (690.64(8). <br />5 One ofthe standard electrical diagrams(E1.l,E1.1a,El.1b,orEl.lc)canbeusedtoaccuratelyrepresentthePV <br />system. Interactive PDF diagrams are available at www.solarabcs.org/permitting. <br />Fill out the standard electrical dialrum completely. A guide to the eLectrical dialram is provi<led to help the applicant <br />understand eoch blqnk to fl't in. If the elecffical system is nnre complex than the standard electrical diagrom ccn elJectively <br />communicate. provide an all€rnative diagram with qppropriate detafl. <br />2 ExpEDrrED P[RMlr PRocEss roR PV sysrEMs <br />IJ No, submit completed worksheet Jor roof structute wKSl (No = heavy masonry, sldte, etc...). <br />2. Does the roof have a single roof coveringz Eves Ino <br />IJ No, submit completed worksheetfor rooJ structure wKsl. <br />3. Provide method and type of weatherproofing roof penetrations (e.g. flashing. curlk).!9!48495-- <br />M ount ing Sy s t efi lrlfornation : <br />1 . ls the mounring srructure an elgineered producr designed ro mount PV modules with no more than an 18" gap <br />benearh rhe module frames? E yes E tto <br />IJ No, protide details ol structurd.l attachment certirted by a design proJessional. <br />2. F'br manufactured mounting systems, hll out information on the mounting system below: <br />a. Mounting System Manufacturer SOLAMCK Producr Name and 114o6"1lAdjustable' Tile Hook IGB-SR-ADJS
The URL can be used to link to this page
Your browser does not support the video tag.