Laserfiche WebLink
*,,SANTA <br />NA,Iffi <br />Planning & Building Agency <br />Building Safety Division <br />20 Civic Center Plaza <br />P.O. Box 1988 (M-19) <br />Santa Ana, CA92702 <br />(714) 647.s800 <br />www.santa.ana.org <br />RESIDENTIAL <br />PHOTOVOLTAIC <br />CHECKLIST <br />soL-or cBc 2013 <br />Solar Photovoltaic (PV) Checklist for Detached SINGLE FAMILY RESIDENCES Only <br />lnstructions: The licensed contractor of record shall complete all sections, answer the ten questions and <br />sign the certification section below. A copy of this form shall be attached to each of TWO sets of plans, of <br />minimum 11" x 17" size. lf answerino NO to anv of the ouesti ons. Dlan check shall be reouired <br />Project Address:z:z-a =.Contractor Company Name: <br />Contractor License Number: <br />eC> € NR-t>,-Z <br />YES NO <br />1. BA <br />2 qll <br />,74 <br />4 ETII <br />5 Ertr <br />6 €Ftr <br />7.81 tr <br />8. ,El tr <br />e €1 tr <br />.,F <br />?gstttl <br />Are the following applicable to the proposed project? <br />Will the PV system layout provide the required three-foot wide clear access pathways <br />per Section 605.11 of the California Fire Code, and is this shown on the roof plan? <br />Will the PV system be installed on a roof having only one roofing layer with no <br />overlays? <br />Will the PV array be flush mounted to the existing roof so that the plane of the <br />modules (panels) are parallel to the plane of the roof? <br />Will the PV system weigh maximum 4 pounds per square feet or less? <br />Will the PV system be installed where the modules do not overhang any roof edges <br />(such as eaves, gabled ends, ridges and hips)? <br />Will the PV system be installed with a space of 2" minimum to 10" maximum between <br />the underside of modules and the surface of the roof? <br />Will the PV system be installed without using any ballast system or counter-weight <br />system? <br />Will the anchors be installed with a maximum horizontal anchor spacing of 6 feet <br />and is this maximum horizontal spacing shown on the plans? <br />Will the minimum 5/16" lag screws be installed with a minimum of 2-112 inch <br />embedment into roof rafters (with pre-drilled holes) and is this minimum embedment <br />shown on the plans? <br />Are ALL the structural pages of the plans stamped and signed by a California <br />licensed professional engineer? (including project specific site plan, PV layout, <br />anchorage spacing, anchorage details and manufacturer's support information.) <br />I certify under penalty of perjury under the laws of the Stat of <br />Print Name ?+..^Signature <br />Date: <br />tr <br />u l{rr.NsDJ <br />Phone Number <br />Email Address: <br />bZ-c-'>=oi *B\)lD <br />ove I <br />Rev: 11/19/2015 <br />?eepz.--,\) (ZeooaNez C-(> Lol \ 1 <br />true: <br />U