Laserfiche WebLink
\8city of santa Ana 20 civic center Plaza (M-19), santa Ana, cA 92702 <br />PermitCounter: (714)647-5800 lnspection Requests: (714)667-2738 lnspectorSection: (714)647-5853 <br />Mechanical Permit #: 4O{3OO68 <br />Pin #: 373o2 <br />Project Address: 550 S Harbor Blvd <br />Assessor'sParcel: 108-681-05 Lot: <br />Unit: <br />Block:NA <br />Bldg: <br />Tract: NA <br />Address Range: <br />Historic: No <br />Suite Range: <br />Zoning: <br />Owner: <br />Address: <br />Phone <br />Tenant Name: <br />Contractor: <br />Address: <br />Phone: <br />KB Home Coastal lnc. <br />36310 lnland Valley Dr <br />Wildomar, CA 92595 <br />(951) 691-5300 <br />KB Home Coastal, lnc. <br />10990 Wilshire Blvd. Ste. 70 <br />Los Angeles, CA 90024 <br />(310) 2314000 <br />01 1 16002 <br />01 1 16002 <br />01 1 16002 <br />01 1 16002 <br />01 1 16002 <br />01 1 16002 <br />01't16002 <br />01 1 16002 <br />01 1 1 6002 <br />01 't 16002 <br />51 604 <br />51 604 <br />51 604 <br />5't604 <br />51 604 <br />51604 <br />51604 <br />53603 <br />51600 <br />51604 <br />Fee Type Amount <br />Furnace 61.07 <br />Compressor 84.00 <br />Air Handling 41.46 <br />Clothes Dryer - Residen 37.57 <br />Bathroom Fan 28.42 <br />Laundry Fan Envir. Air 32.45 <br />Range Fan 30.09 <br />P/C - Repeat at 50% 279.10 <br />General Plan Update 20.56 <br />lssuance 51 .26 <br />Qty <br />1.00 <br />1.00 <br />1.00 <br />1.00 <br />5.00 <br />1.00 <br />1.00 <br />0.50 <br />1.00 <br />1.00 <br />Fee <br />$61.07 <br />$84.00 <br />$41.46 <br />$37.57 <br />$1 42.1 0 <br />$32.45 <br />$30.09 <br />$139.s5 <br />$20.s6 <br />$51.26 <br />State Lic #: 630879 <br />Lic Type: B <br />Bus. Lic #: 362804 <br />Workers' Compensation I nsurance:Carrier: Star lndemnity & Liability Company <br />Policy #: 1000001836 <br />Expires: 0913112017 <br />Building Use: <br />Job Type: <br />Nature of Work: <br />Single Family Dwelling <br />New <br />New SFD w/att garage <br />Occupancy: <br />Constr Type: <br />Code: <br />Date: <br />Date: <br />Date: <br />R-3, U <br />V B, SPK <br />cMc 2013 Notes: Plan l/fee pd on M-69149 <br />Planning Conditions: <br />Planning Approval By: <br />Plan Checked By: <br />Permit lssued By: Hernandez, Kathy <br />Subject to Field: <br />Buildins Permit #: 10189806 <br />Every permit issued shall become invalid unless the work on the site <br />authorized by such permit is commenced within 180 days after its <br />lssuance, or if the work authoized on the site by such permit is suspended <br />or abandoned for a period of 1 80 days after the time the wo* is <br />commenced. <br />02115t2017 <br />Account# <br />Misc. Receipt: 69'149 <br />Misc. Receipt: <br />Misc. Receipt: <br />Total <br />PAID <br />FEB 1 5 2017 <br />Fee Total: <br />Paid to Date: <br />Balance Due: <br />$640.11 <br />$640.11 <br />$0.00 <br />lnspector MID#: 2016-129105 <br />N/A - No Balance ty of Santa Ana