Laserfiche WebLink
*,,SANTA <br />NA/,ffi <br />Planning & Building Agency <br />Building Safety Division <br />20 Civic Center Plaza <br />P.O. Box 1988 (M-19) <br />SantaAna, CA92702 <br />(714) 647-s800 <br />www.santa-ana.org <br />RESIDENTIAL <br />PHOTOVOLTAIC <br />CHEGKLIST <br />sol-01 cBC 2013 <br />Solar Photovoltaic (PV) Checklist for Detached SINGLE FAMILY RESIDENCES Only <br />lnstructions: The licensed contractor of record shall complete all sections, answer the ten questions and <br />sign the certification section below. A copy of this form shall be attached to each of TWO sets of plans, of <br />minimum 11" x 17" size. lf answerinq NO to anv of the questions. plan check shall be required. <br />Project Address:[(r t (osro,cao rt* <br />Contractor Company Name: <br />Contractor License Number: <br />Yn rt*-{ /- ,-z So u-A r( <br />YES/,NO1 EItr <br />2ce <br />3da <br />4(n5we <br />6{e <br />rde <br />8 gcl <br />ede <br />10 {e <br />1r{ < c f <br />Are the following applicable to the proposed project? <br />\Mll the PV system layout'provide the required three-foot wide clear access pathways <br />per Section 605.1'1 of the California Fire Code, and is this shown on the roof plan? <br />Will the PV system be installed on a roof having only one roofing layer with no <br />overlays? <br />Will the PV array be flush mounted to the existing roof so that the plane of the <br />modules (panels) are parallel to the plane of the roof? <br />Will the PV system weigh maximum 4 pounds per square feet or less? <br />Will the PV system be installed where the modules do not overhang any roof edges <br />(such as eaves, gabled ends, ridges and hips)? <br />Will the PV system be installed with a space of 2" minimum to 10" maximum between <br />the underside of modules and the surface of the roof? <br />Will the PV system be installed without using any ballast system or counter-weight <br />system? <br />Will the anchors be installed with a maximum horizontal anchor spacing of 6 feet <br />and is this maximum horizontal spacing shown on the plans? <br />Will the minimum 5/16" lag screws be installed with a minimum of 2-112 inch <br />embedment into roof rafters (with pre-drilled holes) and is this minimum embedment <br />shown on the plans? <br />Are ALL the structural pages of the plans stamped and signed by a California <br />licensed professional engineer? (including project specific site plan, PV layout, <br />anchorage spacing, anchorage details and manufacturer's PV support information.) <br />I certify under penalty of perjury. undqr the laws of the <br />Print Name:\[n*1, I- F V fah <br />' "." i . <br />State of <br />ignature: <br />iforn is true: <br />Phone Number: <br />EmailAddress: <br />Rev: 11/19/20'15 <br />0 o r 5 Date:i5r7 <br />L @ <br />(