My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
20170552 - Permit
PBA
>
Building
>
Permits
>
B
>
Berkeley St
>
326 E Berkeley St
>
20170552 - Permit
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/2/2021 7:51:20 AM
Creation date
6/2/2021 7:51:19 AM
Metadata
Fields
Template:
Permit
Permit Number
20170552
Full Address
326 E Berkeley St
Permit ID
262153
Master ID Number
2020-156986
Project Name
Miscellaneous Counter1 Permit
Street Number
000326
Street Direction
E
Street Name
Berkeley
Street Suffix
St
Building Use Code
Resid-1 unit
Job Types
Solar
Permit Type
Electrical
Applied Date
1/9/2020
Issued Date
1/9/2020
Finalized Date
1/28/2020
Flood Zone
X-0602320276J
Description of Work
Installation of roof mounted PV system. All fees paid on #101102792
Nature of Work
Solar
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Show annotations
View images
View plain text
EXPEDITED PERMIT PROCESS FoR SMALL-SCALE PV SYSTEMS <br />STANDARD STRINC SYSTEM <br />The information in this guideline is inlended ro help local jurisdicrions and conrractors identify when pv sysrem insmllations <br />are simple, needing only a basic review. and when an inshllation is more complex. Ir is likely thar 50 % -75 % of all residential <br />systems will comply with these simple criteria. For projecrs that fail ro meer the simple crireria, resolution steps have been <br />suggesled to provide as a parh ro permit approval. <br />Required. Infonnation for Pemit: <br />l. Sire plan showing location ol malor components on rhe properry. Thjs drawing need not be exacrly ro scale, but ir <br />should represent relative locarion of componenrs ar sire (see supplied example sire plan). pV arrays on dwellings <br />with a 3'perimeter space at ridge and sides may nor need separate frre service review <br />2 Electrical diagram showing PV array conhguration, wiring system, overcurrent prorection, invertet disconnecrs, <br />required signs, and ac connecrion to building (see supplied standard electrical diagram) <br />3 Specification shee6 and installation manuals (if available) lor all manufactured components including. but nor <br />limited to, PV modules, inverter(s), combiner box, disconnects. and mounring system. <br />Step 1 : Structural Review o[ PV Array Mounting System <br />Is the aray to be mounted on a defrned, permined mof structure? Elyes ENo <br />I No due to non-comphanL rool or a ground mount. submit completed wothsheet.for the structure wKSl . <br />Roof Infomatton: <br />t ls the roohng type lighrweighr (Yes = composirion, lighrweight masonry, meral, erc )COMP SHINGLE <br />IlNo, submit completed. worksheet for roof stucture WKSI (No = hea.vy masonry, slate, etc.. )2 Does the rool have a single rool coveringz Eyes n f,lo <br />If No, submit completed worksheet Jor rooJ structure WKSI . <br />Provide method and rype of wearherproohng rool penetrations (e.g. nashjng. caulk)Flashing <br />M ounting Sy st e1n InforTnation <br />l Is the mounting structure an <br />beneath rhe module trames?Yes E <br />neered <br />NO <br />product designed to mount PV modules with no more rhan an t 8' gap <br />) <br />e <br />U No, proyide details of sttuctural attachment cefiif.ed by a design projessional. <br />2 For manufactured mounting systems, fill out information on the mounring system below <br />srem Manufacrurer EcoFasten product Name and 114e6s14 Rock it <br />ht of PV Modules 3n6 n6115 712.4 lbs <br />, r22 <br />a. i\4ounting Sy <br />b Total Weig <br />c. Total Number of Amachmenr Poin <br />d. Weighr per Arrachmenr Poinr (b - c)32.4 bs (il grearer rhan 45 lbs, see WKS I ) <br />ir' <br />e Maximum spacing Between Amachmenr points on a Rail 48 inches (see producr manual for <br />maximum spacing allowed based on maxjmum design wind speed) <br />f. Total Surface Area of PV Modules (square feeD 246.5 <br />g. Dislributed Weighr of PV Module on Roof (b + 0 2.9 lbs/ft1 <br />IJ distributed weight oj the pV system is greater than 5 tbs/fp, see WKS| . <br />Step 2: Electrical Review o[ PV System (Calculations for Electrical Diagram) <br />In order for a Pv system ro be considercd for an expedited permit pmcess, the following must apply: <br />l. PV modules, utility-interactive inverrers, and combiner boxes are identifred for use in pV systems. <br />2 The PV array is composed of 4 series srrings or less per inverter <br />3 The total inverter capacity has a conrinuous ac power output I3,440 Wafts or less <br />4. The ac interconnecrion point is on the load side of service disconnecting means (690.64(8)). <br />5 One of the standard electrical diagrams (E1.I, E1 la,El.lb,orELlc)canbeusedtoaccurarelyrepresentrhepV <br />system. Inreractive PDF diagrams are available at wwwsolarabcs.org/permitting. <br />Fill out the standard electrical diagrqm completely. A guide to the eLecttcat diagram is provided to help the qpplicant <br />understand eq.ch blank to ill in. I.f the etectricdt system is more complex than the standard electical dtogram can efJecttvety <br />communicate, provide an alternative diogram with qppropriate detail. <br />2 IXPEDITED PERMIT PROCESS FOR PV SYSTEMS
The URL can be used to link to this page
Your browser does not support the video tag.
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).