Laserfiche WebLink
RESIDENTIAL <br />PHOTOVOLTAIC <br />CHECKLIST <br />sol-01 cBC 2016 <br />Solar Photovoltaic (PV) Checklist for Dotached SINGLE FAMTLY RESIDENCES Only <br />lnstructions: The licensed contractor of record shall complete all sections, answer the ten questions and <br />sign the certification section below. A copy of <br />mrnrmum 11" x 17" size. lf answerinq NO <br />this form shall be attached to each <br />any of the ouestions. olan check <br />of TWO sets of plans, of <br />shall be required.b <br />Contractor Company Name: <br />Contractor License Number: <br />10.tr <br />6t.r <br />2 <br />3 <br />4 <br />5 <br />Are the following applicable to the proposed project? <br />Will the PV system layout provide the required three-foot wide clear access pathways <br />per Section 605.1 1 of the California Fire Code, and is this shown on the roof plan? <br />Will the PV system be installed on a roof having only one roofing layer with no <br />overlays? <br />Will the PV anay be flush mounted to the existing roof so that the plane of the <br />modules (panels) are parallel to the plane of the roof? <br />Will the PV system weigh maximum 4 pounds per square feet or less? <br />Will the PV system be installed where the modules do not overhang any roof edges <br />(such as eaves, gabled ends, ridges and hips)? <br />Will the PV system be instialled with a space of 2" minimum to 10" maximum between <br />the underside of modules and the surtace of the roof? <br />Will the PV system be lnstalled without using any ballast system or counter-weight <br />system? <br />Will the anchors be installed with a maximum horizontal anchor spacing of 6 feet <br />and is this maxlmum horizonlal spacing shown on the plans? <br />Will the minimum 5/16" lag screws be installed with a minimum ol2-112inch <br />embedment into roof rafters (with pre-drilled holes) and is this minimum embedment <br />shown on the plans? <br />Are ALL the structural pages of the plans slamped and signed by a California <br />licensed professional engineer? (including project specific site plan, PV layout, <br />anchorage spacing, anchorage details and manufacturer's PV support information.) <br />I certify under penalty of perjury und he laws of the State of Cal a <br />Print Name Signature <br />Phone Number: <br />Email Address: <br />tr <br />NO <br />tr <br />tr <br />tr <br />tr <br />'fi <br />l <br />7 <br />flu <br />flu <br />fla <br />7tr <br />6 <br />7 <br />8 <br />I <br />Rev: 8/29/19 <br />r <br />ate <br />a that <br />o <br />ts e <br />Planning & Building Agency <br />Building Safety Division <br />20 Civic Center Plaza <br />P.O. Box 1988 (M.19) <br />Santa Ana, CA 92702 <br />(714) 647-5800 <br />tivww,sanla.ana.org <br />Project Address: <br />I