My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
20170557 - Permit
PBA
>
Building
>
Permits
>
C
>
Cedar St
>
2138 S Cedar St
>
20170557 - Permit
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/2/2021 7:51:29 AM
Creation date
6/2/2021 7:51:27 AM
Metadata
Fields
Template:
Permit
Permit Number
20170557
Full Address
2138 S Cedar St
Permit ID
262165
Master ID Number
2020-156993
Project Name
Miscellaneous Counter1 Permit
Street Number
002138
Street Direction
S
Street Name
Cedar
Street Suffix
St
Building Use Code
Resid-1 unit
Job Types
Solar
Permit Type
Electrical
Applied Date
1/9/2020
Issued Date
1/9/2020
Finalized Date
2/4/2020
Flood Zone
X-0602320278J
Description of Work
Install roof mounted solar panels. FEES PD ON 101102798.
Nature of Work
Solar
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
EXPEDITED PERMIT PROCESS FOR SMALL_SCALE PV SYSTEMS <br />SIANDARD STRING SYSTEM <br />The information in this guideline is inrended to help local jurisdictions and contractors identify when PV system installations <br />are simple, needing only a basic review and when an installation is more complex. Ir is likety rhat 50%-75% of all residential <br />systems will comply with lhese simple criteria. For projects that fail to meet the simple criteria, resolution steps have been <br />suggested to provide as a path to permit approval. <br />Required Inforrnation Jor Permit: <br />1. Site plan showing location of major componenrs on the property. This drawing need not be exactly to scale, but it <br />should represent relative location of components at siLe (see supplied example site plan). PV arrays on dwellings <br />with a 5' perimeter space at ridge and sides may not need separate hre service review. <br />2. Electrical diagram showing PV array connguration, wiring system, overcurrenr protection, inverter, disconnects, <br />required signs, and ac connection to building (see supplied srandard elecrrical diagram) <br />3. Specifrcation sheets and installarion manuals (if available) for all manufactured components including, bur nor <br />limiled rc, PV modules. inverter(s), combiner box, disconnects, and mounting system. <br />Step 1 : Structural Review o[ PV Anay Mounting System <br />Is the aray to be mounted on a defined, permitted roof structure? E y"" E no <br />$ No due to non-comphant roof or a ground mount , submit completed wotksheet Jor the structure WKS 1 . <br />Roof Infoflnation: <br />l. ls the roohng type lighrweight (Yes = composition, lightweighr masonry, meral, erc.. )COMP SHINGLE <br />If No, submit completed worksheet for roo.f structure WRSI (No = heayy masonry, slate, etc...) <br />2 Does the roof have a single roof coveringt Eyes E no <br />If No, submit completed worhsheet Jor rooJ structure WKS 1 . <br />3. Provide method and type of wearherproofing roo[ penetrations (e.g. flashing, caulk)Flashing <br />Mounting Systeln Infonnation <br />en ineered product designed to mount PV modules with no more rhan an t 8" gap <br />beneath the module frames?Yes E no <br />IJ No, proyide detaib ol structural attachment certifed W a design professional. <br />2. For manufacrured mounting systems, nll out intormarion on rhe mounting system below <br />a Mounring Sysrem Manulacturer !99!99!9L Producr Name 2n6 N4e6s1g Rock it <br />b Total weighr of PV Modules un6 gu11r 712.4 15t <br />c. Total Number of Anachmenr Poinrs 22 <br />d. Weighr per Atmchment Point (b -:- c)32.4 <br />l. Is rhe mounting structure an <br />s (if greater than 45 lbs. see WKS I ) <br />Maximum SDacino Belween Atrachmenr Points on a Rarl 48 inches (see oroducl manual lor <br />maximum spacing allowed based on maximum design wind speed) <br />Toral Surface Area oF PV Modules (square feet)246.5 <br />lh <br />f ft2 <br />Distributed Weight ot PV Module on Roof (b + D lbs/fr'? <br />If distributed weight oj the PV system is greater than 5 lbs/ft') , see WKS 1 . <br />Step 2: Electrical Review o[ PV System (Calculations for Electrical Diagram) <br />In order for a Pv system to be considercd for an expedited permit process, the following must apply: <br />t. PV modules, utility-interactive inverters, and combiner boxes are identified for use in PV systems. <br />2. The PV array is composed of 4 series strings or less per inverter. <br />3. The total inverter capacity has a conLinuous ac power output 13,440 Wat6 or less <br />4. The ac interconnection point is on the load side of service disconnecting means (690.64(8)). <br />5. One of the standard elecrrical diagrams (E l I , E l I a, E I I b, or E 1 . I c) can be used to accurately represent the PV <br />sysrem. Interactive PDF diagrams are available at www.solarabcs.org/permirting <br />FiLL out the standard electical diagram completely. A guide to the elecfficat diagram is provid.ed to help the applicant <br />understand each blanh to ill in. If the electricql system is more complex than the standard electricsl diagram can e.ffectiyely <br />communicote, provide an altematiye diagram with sppropriate detail. <br />2 txprDlltD pERMtr pRocESs FoR I,v sysrEMS
The URL can be used to link to this page
Your browser does not support the video tag.