Laserfiche WebLink
,,,-SANTA <br />NA <br />IL$irfic <br />& SUIIDI\C <br />$NiI <br />Planning & Building Agency <br />Building Safety Division <br />20 Civic Center Plaza <br />P.O. Box 1988 (M-19) <br />Santa Ana, CA 92702 <br />(714) 647-5800 <br />www.santa-ana.org <br />RESIDENTIAL <br />PHOTOVOLTAIC <br />CHECKLIST <br />sol{1 cBc 2013 <br />solar Photovoltaic (PV) checklist for Detached SINGLE FAMILY RESIDENCES Only <br />lnstructions: The licensed contractor of record shall fill in the address of the project, conlractor's <br />licensing information and answer questions 1 -10 below. Complete and sign the certification section <br />**lf answering NO to any ofthe questions, plan check shall be required.** <br />Proiect Address:2720 NORTH OLIVE LANE SANTA ANA, CA92706 <br />Contractor Company Name:CLE,AN INITIATIVE LLC <br />Contractor License Number:# r038376, ts <br />YES NO <br />1 Etr <br />trtr <br />Ettr <br />trtr <br />trtr <br />Are the following applicable to the proposed project? <br />Will the PV array be flush mounted to the existing roof so that the plane of the <br />modules (panels) are parallel to lhe plane of the roof? <br />Will the PV system weigh maximum 3 pounds per square feet or less? <br />Will the PV system be installed where the modules do not overhang any roof edges <br />(such as eaves, gabled ends, ridges and hips)? <br />Will the PV system be installed with a space of 2" minimum to 10" maximum between <br />the underside of modules and the surface of the roof? <br />Will the PV system be installed without using any ballast system or counter-weight <br />system? <br />Will the PV system be installed on a roof having only one roofing layer with no <br />overlays? <br />Will the PV system layout provide a three-foot wide clear access pathway per the <br />latest edition of "Guideline for Fire Safety Elements of Solar Photovoltaic Sysfems" <br />by OCFA? (Guideline available on the OCFA website: http://www.ocfa.orq) <br />Do the plans show a maximum horizontal anchor spacing of 6 feet? <br />Do the plans show a minimum of 2-112 tnch lag screw embedment into roof rafters? <br />Are ALL the structural pages of the plans WET stamped and signed by a California <br />licensed professional engineer? (including project specific site plan, PV layout, <br />anchorage spacing, anchorage details and manufacturer's PV support information.) <br />Etr <br />trtr <br />I certify under penalty of perjury under the laws of the State of California that the above is true <br />8 Eltre trEl <br />10-BE <br />Print name: <br />Phone Num <br />Email Addre <br />Rev:2h112015 <br />SS <br />ber <br />Signature <br />Date 112020 <br />.t <br />2. <br />3. <br />4. <br />5. <br />o. <br />7. <br />)