Laserfiche WebLink
*,,SANTA <br />ANAJl.ffi! <br />Planning & Building Agency <br />Building Safety Division <br />20 Civic Center Plaza <br />P.O. Box 1988 (M.19) <br />Santa Ana, CA 92702 <br />(7r4) 647-s800 <br />www.sanla.ana.org <br />RESIDENTIAL <br />PHOTOVOLTAIC <br />CHECKLIST <br />- <br />sol-o1 cBc 2013 <br />contractor company Hame: SOUTHWEST SUN SOLAR, INC <br />contractorLiconseNumber: 1004667 <br />2 <br />3 <br />YES NO <br />E tr <br />8. Etr <br />9. Etr <br />print Name: MlMl NGO <br />Etr <br />Ettr <br />tstr <br />Ettr <br />EB <br />EItr <br />Are the following applicable to the proposed project? <br />Will the PV system layout provide the required three-foot wide clear access palhways <br />per Section 605.11 of the Califomia Fire Code, and is this shown on the roof plan? <br />Will the PV system be installed on a roof having only one rooling layer with no <br />overlays? <br />Will the PV aray be flush mounted to the existing roof so that the plane of the <br />modules (panels) are parallel to the plane of the roof? <br />Will the PV system weigh maximum 4 pounds per square feet or less? <br />Will the PV system be installed where the modules do not overhang any roof edges <br />(such as eaves, gabled ends, ridges and hips)? <br />Will the PV system be installed with a space of 2" minimum to 10" maximum between <br />the underside of modules and the surface of the roof? <br />Will the PV system be installed without using any ballast system or counter-weight <br />system? <br />Will the anchors be installed wilh a maximum horizontal anchor spacing of 6 feet <br />and is this maximum horizontal spacing shown on the plans? <br />Will the minimum 5/16" lag screws be installed with a minimum of 2-1l2inch <br />embedment into roof rafters (with pre-drilled holes) and is this minimum embedment <br />shown on the plans? <br />Are ALL the structural pages of the plans WET stamped and signed by a Califomia <br />licensed professional engineer? (including projecl specific sile plan, PV layout, <br />anchorage spacing, anchorage details and manufacture/s PV support information.) <br />4 <br />6 <br />7 <br />10 tstr <br />I certify under penalty of periury under fhe laws of the State of California aat ,t-" i-"t <br />Phone Number: 714 582 3909 <br />Signature <br />Date <br />Emai I Address: PERMIT@SOUTHWESTSUNSOLAR.COM <br />Rev ah712015 <br />a <br />JU <br />Solar Photovoltaic (PV) Checklist for Detached SINGLE FAMTLY RESTDENCES Only <br />lnstructions: The licensed contractor of record shall complete all sections, answer the len questions and <br />sign the certification section below. A copy of this form shall be attached to each of TWO sets of plans, of <br />minimum 11" x 17" size. lf answerinq NO lo anv ofthe questions. plan check shall be required. <br />Prolect Address:2209 ORANGE AVE, SANTA ANA, CA 92707