My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
20170585 - Permit
PBA
>
Building
>
Permits
>
O
>
Orange Ave
>
2209 S Orange Ave
>
20170585 - Permit
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/2/2021 8:18:50 AM
Creation date
6/2/2021 8:18:49 AM
Metadata
Fields
Template:
Permit
Permit Number
20170585
Full Address
2209 S Orange Ave
Permit ID
262257
Master ID Number
2020-157065
Project Name
Miscellaneous Counter1 Permit
Street Number
002209
Street Direction
S
Street Name
Orange
Street Suffix
Ave
Building Use Code
Resid-1 unit
Job Types
Solar
Permit Type
Electrical
Applied Date
1/14/2020
Issued Date
1/14/2020
Finalized Date
1/31/2020
Flood Zone
X-0602320278J
Description of Work
Install solar panel per PV checklist. Fees paid on Bldg permit # 101102839.
Nature of Work
Solar
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
EXPEDITED PERMIT PROCESS FOR PV SYSTEMS <br />MICRO-INVERTER <br />The Solar America Board for Codes and Standards (Solar ABCS) Expedited Permit Pro- <br />cess provides a means to differentiate systems that can be permitted quickly and easily <br />due to rheir similarity with the majority o[ small-scale PV systems. Those systems with <br />unique characteristics may be handled with small additions to this Expedited Permit <br />Process or may require much more information, depending on the uniqueness of the <br />installation. <br />EXPEDITED PERMIT PROCESS FOR PV SYSTEMS - MICRO-INVERTER <br />The following pages contain forms for the Micro-lnverter to use with the Expedited Per- <br />mit Process. The Standard String, AC Module, and Supply-Side Connection forms <br />are also available as interactive PDF iiles at www.solarabcs.org/permitting. In jurisdic- <br />rions rhar have adopted rhe Expedited Permit Process for PV Systems, these forms can <br />be filled out electronically and submitted in either printed form and via email. An elec- <br />tronic format is used so that the supplied information is standardized and legible for the <br />local jurisdiction.
The URL can be used to link to this page
Your browser does not support the video tag.