Laserfiche WebLink
EXPEDITED PERMIT PROCESS FOR SMALL-SCALE PV SYSTEMS <br />STANDARD STRING SYSTEM <br />The informarion in rhis guideline is intended to help Iocal jurisdictions and contractors identify when PV system inslallations <br />are simple, needing only a basic review and when an installation is more complex. It is likely that 50 % -75 % of all residential <br />systems will comply with these simple criteria. For projects that fail to meet the simple criteria, resolution steps have been <br />suggesred to provide as a path to permit approval. <br />Reqtireil InJonnation for P*mit: <br />l. Site plan showing location of major components on the property. This drawing need not be exactly to scale, but it <br />should represent relative location of components at site (see supplied example site plan). PV arrays on dwellings <br />with a 3'perimeter space at ridge and sides may not need separate hre service review. <br />2. Elecfttcal diagram showing PV array configuration, wiring system, overcurrent protection, inverter, disconnecls, <br />required signs, and ac connec[ion to building (see supplied standard electrical diagram). <br />3. Specihcation sheets and installation manuals (if available) for all manufaclured components including, but not <br />limited ro, PV modules, inverter(s), combiner box, disconnects, and mounring system. <br />Step 1 : Structural Review of PV Array Mounting System <br />Is the array to be mounted on a defined, permitted roof structure? EY"tEno <br />IJ No due to non-compliant rooJ or a ground mount, submit completed worksheet.fot the structure WKSl. <br />Roof Information: <br />I . Is the roonng type lightweight (Yes = composition, lightweight masonry, metal, etc...) <br />If No, submit completed worksheet for rooJ structure w1(Sl (No = <br />2. Does the roof have a single roof coveringz Elyes Ello <br />If No, submit completed worksheet Jor roof stucture WKSI . <br />3. Provide method and type of weatherproofing roof penetr <br />M ountbtg Ey st e fi Info rmat ion : <br />heavy masonry, slate, etc . . .) <br />arions (e.g. flashing, caulk)FLASHING Y CAULK <br />l Is rhe mounting strucrure an <br />beneath the module frames? <br />en neered product designed to mount PV modules with no more than an 18" gap <br />Yes tr No <br />If No, provide details ol struchtral attachment certified by a d6ign prokssional. <br />2. For manufactured mounting systems, fill out information on the mounting system below <br />a MounIng Sysrem Manufactul er oUtcK [,iouNT roduct Na me and Model# CLASSIC COMPOSITION MOUNT <br />b. Total Weight o f PV Modules and P2;15 712 8 bs <br />c. Total Numb er of Atrachmenr Points 24 <br />d. weighr per Aftachment Point 1b*c;297 lbs (if greater than 45 lbs,seewKSl) <br />e. Maximum Spacing Between Atachment Points on a Rail 48 inches (see product manual for <br />maximum spacing allowed based on maximum design wind speed) <br />L Toral Surface Area o[ PV Modules (square feet)945 <br />g. Distributed weight of PV Module on Roof (b + 0 0.75 lbs/ft': <br />IJ distributed weight of the Pv system is greatet than 5 lbs/ft'?, see WKSI . <br />Step 2: Electrical Review o[ PV System (Calculations lor Electrical Diagtam) <br />In order for a Pv system to be considered for an expedited permit process, the following must apply: <br />t. pV modules, utility-interactive inverters, and combiner boxes are identified for use in PV systems. <br />2. The PV array is composed of 4 series strings or less per inverter <br />5. The total inverter capacity has a continuous ac power output I 3,440 Watts or less <br />4. The ac interconnection point is on the load side of service disconnecting means (690.64(8). <br />5. One of rhe standard etecrrical diagrams (E I . I , E L I a, E 1 . 1 b, or E I . I c) can be used to accurately represent the PV <br />system. Interactive PDF diagrams are available at www.solarabcs.org/permitting. <br />Fill out the standard electrical diagram completely. A guide to the electrical diagram is provided to help the apPlicant <br />understand each blank to lll in. IJ the electrical system is more complex than the standard electical diagram can elJectively <br />communicate, provide an alternatite diagram with apProPriate detail. <br />2 EXPEDITED PERMIT PROCESS FOR PV SY5TEMS <br />COMP SHINGLE <br />fr'?