My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
20170711 - Permit
PBA
>
Building
>
Permits
>
K
>
Kemper Ave
>
1925 E Kemper Ave
>
20170711 - Permit
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/2/2021 8:19:33 AM
Creation date
6/2/2021 8:19:32 AM
Metadata
Fields
Template:
Permit
Permit Number
20170711
Full Address
1925 E Kemper Ave
Permit ID
262833
Master ID Number
2020-157499
Project Name
Miscellaneous Counter1 Permit
Street Number
001925
Street Direction
E
Street Name
Kemper
Street Suffix
Ave
Building Use Code
Resid-1 unit
Job Types
Solar
Permit Type
Electrical
Applied Date
1/31/2020
Issued Date
1/31/2020
Finalized Date
2/18/2020
Flood Zone
X-0602320164J
Description of Work
Solar fees paid on #101103007. Service Meter upgrade. Handout given.
Nature of Work
Solar/service meter
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
EXPED]TED PERMIT PROCESS FOR PV SYSTEMS <br />STANDARD STRINC SYSTEM <br />The Solar America Board for Codes and Standards (Solar ABCS) Expedited Permit Pro- <br />cess provides a means to differentiate systems that can be permit{ed quickly and easily <br />due to their similarity with the majority of small-scale PV systems. Those systems with <br />unique characteristics may be handled with small additions to this Expedited Permit <br />Process or may require much more information, depending on the uniqueness of the <br />installation. <br />The following pages conrain forms for rhe Standard String Sysrem to use with the Expe- <br />dited Permit Process. The Microlnverter, AC Module, and Supply-Side Connection forms <br />are also available as interactive PDF files at www.solarabcs.org/permitting. In jurisdic- <br />tions thar have adopred rhe Expedired Permir Process for PV Sysrems, these forms can <br />be filled out electronically and submitted in either printed form and via email. An elec- <br />tronic iormat is used so rhat the supplied information is standardized and legible for the <br />local jurisdiction. <br />$tsso <br />)o 17ot tr go"*o <br />EXPIDITID PERMIT PROCESS FOR PV SYSTEMS
The URL can be used to link to this page
Your browser does not support the video tag.