My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
20163721 - Permit
PBA
>
Building
>
Permits
>
H
>
Hemlock Way
>
2225 W Hemlock Way
>
20163721 - Permit
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/2/2021 8:46:01 AM
Creation date
6/2/2021 8:45:59 AM
Metadata
Fields
Template:
Permit
Permit Number
20163721
Full Address
2225 W Hemlock Way
Permit ID
232289
Master ID Number
2017-137509
Project Name
Miscellaneous Counter1 Permit
Street Number
002225
Street Direction
W
Street Name
Hemlock
Street Suffix
Way
Building Use Code
Resid-1 unit
Job Types
Solar
Permit Type
Electrical
Applied Date
7/19/2017
Issued Date
7/19/2017
Finalized Date
8/22/2017
Flood Zone
X-0602320259J
Description of Work
Install (14) roof mounted solar panels. FEES PD ON 10193563
Nature of Work
Solar
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
EXPEDITED PERMIT PRoCESS FoR SMALL-SCALE PV SYSTEMS <br />STANDARD STRINC SYSTEM <br />The information in this guideline is inrended to help local jurisdicrions and contracrors idenrify when pv sysrem installarions <br />are simPle. needing only a basic review and when an installation is more complex. It is tikely thar 50 % -l6x of <br />^ll <br />residenrial <br />s,stems will comPly with these simple criteria. For projects that fail to meer tlle simple crireria, resolurion steps have been <br />suElgested to provide as a parh to permir approval. <br />Required btfonnation for Perrnit: <br />I Site plan showing location of major components on the property. This drawing need not be exactly ro scale, but it <br />should represent relative location of components at site (see supplied example sire plan) pV arrays on dwellings <br />with a 3'perimeter space at ridge and sides may not need separare nre service review. <br />2 Electrical diagram showing Pv array conhguration. wiring system, overcurrent protection, inverter, disconnecrs, <br />required signs. and ac connection to building (see supplied srandard elecrrical diagram). <br />3. SPecihcation sheets and installation manuals (if available) for all manufactured components including, but nor <br />limited to, PV modules. inverter(s), combiner box, disconnects, and mounting system. <br />Step 'l : Structural Review o[ PV Anay Mounting System <br />Is the array to be mounted on a detned, permitted roof structur€? Eyes ENo <br />I No due to non'compliant r@J or a ground mount. submtt completed worhsheet lot the structure w(sl <br />RooJ Information: <br />l. ls the roofing rype lighrweighr (yes = composirion, lightweighr masonry. meul. etc. .)Compshingle <br />I! No, submit completed worhsheet for roof stucture WKS1 (No = heavy masonry, state, etc )2 Does rhe roof have a single rool coveringt Eyes Eno <br />Il No, submit completed. vorksheet Jor roof structure WPiS| . <br />3 Provide merhod and type of weathcrproofing roof penetrarions (e.g. flashing. caulk)Flashing,Caul king <br />M o unt ing Sy at em lnfmmtti on : <br />L Is the mounting structure an ejgineered product designed to mount PV modules with no more than an Ig" gap <br />benearh rhe module frames? 14 yes Ll no <br />IJ No, Wvide details ol structural attachment certiied bt a dcsign pro|essionat. <br />2 For manufactured mounring systems, frll out information on the mounting system below <br />a Mounring System Manufacturer sunpower Product Name and Model# invisamount. R€sidontial mounting system <br />b Total Weight of PV Modules and Rails 594 bs <br />Total Number of Attachment poinrc22 <br />Weight per Auachmenr Point (b + c)44 s (if grea[er than 45 lbs. see WKS | ) <br />Maximum Spacing Between Attachment points on a Rail 72 nches (see product manual for <br />maximum spacing allowed based on maximum design wind speed) <br />Total Surface Area of PV Modules (square feet) <br />c <br />d <br />e <br />f <br />c <br />ft: <br />Distribrrred Weighr of PV Module on Roof (b + l)2.3 lbs/ft'z <br />Il distributed weight ol the pV q. tem is greater than 5 lbstf, see WNSI . <br />Step 2: Electrical Review o[ PV System (Calculations lor Electrical Diagram) <br />In order for a Pv system to be consldered for an expedtted permtt prccess, the followlng must apply: <br />I PV modules, utility-interactive inverters, and combiner boxes are identihed for use in pV systems. <br />2 The PV array is composed of 4 series strings or less per inverter. <br />3. The roral inverter capacity has a conrinuous ac power ourpur I J,440 Watts or less <br />4. The ac interconnection point is on rhe load side of service disconnecring means (690.64(8)). <br />5. One of the standard electrical diagrams (El.l, EL la. EI.lb, or El.lc) can be used to accurately represenr rhe pV <br />system. lnferactive PDF diagrams are available at www.solarabcs.org/permitting. <br />Fill out the stdndard electrical diagro.m completely. A guide to the etectrical dlagram is provided to hetp the arylicant <br />understand each blank tolll tn. Il the electricat systan is more complex than the standard electrical iiagram can elJectively <br />communicate, provide an alternatiye diagram with appropriate detail. <br />2 txpEt)trED pEuMrr pRocEss roR pv sysrEMs
The URL can be used to link to this page
Your browser does not support the video tag.