Laserfiche WebLink
Plannlng & Building Agency <br />Bullding Safety Division <br />20 Civic Centor Plaza <br />P.O. Box 1988 (M.19) <br />Santa Ana, CA 92702 <br />(714) 647-s800 <br />www.santa-ana.org <br />RESIDENTIAL <br />PHOTOVOLTAIC <br />CHECKLIST <br />*-SNTA <br />NA <br />il,il{i\lltG <br />ltlltM <br />rcfitr <br />soL-o1 cBc 2013 <br />Solar Photovoltaic (PV) Checklist for Detached SINGLE FAMILY RESIDENCES Only <br />lnstructions: The licensed contractor of record shall complete all sections, answer the ten questions and <br />sign the certification section below. A copy of this form shall be attached to each of TWO sets of plans, of <br />minimum 11" x 17" size. lf answerin NOtoa of the ue tion all be re u ired <br />Project Address: <br />Conlractor Company Name: <br />Contractor Llcense Number: <br />4 <br />5 <br />YES NO <br />1 [da <br />,fra <br />3. za <br />6 ztr <br />7 lzQ <br />IEA <br />,Fa <br />10 dtr <br />tr <br />tr <br />Eil <br />Are the following applicable to the proposed project? <br />Will the PV system layout provide the required three-foot wide clear access pathways <br />per Section 605.1 1 of the Califomia Fire Code, and is this shown on the roof plan? <br />Will the PV system be installed on a roof having only one roofing layor with no <br />overlays? <br />Will the PV array be flush mounted to the existing roof so that the plano of the <br />modules (panels) are parallel to the plane of the roof? <br />Will the PV system weigh maximum 4 pounds per square feet or less? <br />Will the PV system be installed where the modules do nol overhang any roof edges <br />(such as eaves, gabled ends, ridges and hlps)? <br />Will the PV system be installed with a space of 2' minimum to 10" maximum between <br />the underside of modules and the surface of the roof? <br />Will the PV system be lnstalled without using any ballast system or counter-weight <br />system? <br />Wll the anchors be installed with a maximum horizontal anchor spacing of 6 feet <br />and is this maximum horizontal spacing shown on the plans? <br />Will the minimum 5/16" lag screws be installed with a minimum ol2-112incl'r <br />embedment lnto roof rafters (with pre-drilled holes) and ls this minlmum embedmenl <br />shown on the plans? <br />Are ALL lhe structural pages of the plans stamped and signed by a California <br />licensed professional englneer? (lncluding project specific site plan, PV layout, <br />anchorage spacing, anchorage details and manufacture/s PV support information.) <br />e State of Cal rn Ialcertify un er <br />Print Name: <br />Phone Number <br />Email Address: <br />715 S Hickory St, Santa Ana, CA 92701 <br />Solcius <br />976336 <br />Kristen Schow <br />844-357 -2258 lotnlDofi T <br />solarpermits@solcius.com <br />R€v:11/19/2015 <br />Signa <br />Date: <br />is true: