Laserfiche WebLink
*-$NTA <br />NA,ffi <br />Planning & Bu ilding Agency <br />Building Safety Division <br />20 Civic Center Plaza <br />P.O. Box 1988 (M-19) <br />Santa Ana. CA 92702 <br />(7r4) 647-5800 <br />\ rww.santa-ana.org <br />RESIDENTIAL <br />PHOTOVOLTA!C <br />CHECKLIST <br />soL-01 cBc 2013 <br />Solar Photorelt€ic (PV) Checklist for D€t ched SINGLE FAMILY RESTDENCES Only <br />lnstruclions: The lrcens <br />sign the certification sect <br />minimum 11" x 17" size <br />Project Address: <br />Contractor Company Name: <br />Contractor License Number: <br />ed contraclor of record shall complete all sections, answer lhe ten queslions and <br />ion below. A copy of this form shall be attached to each cf TWO sets of plans, of <br />NO to n tions lan <br />L UI <br />Complete Solar Solutions of Cali rnia. lnc. <br />96198 <br />1 <br />YES NOdn <br />da <br />ds <br />u da <br />,da <br />a Eltr <br />ndn <br />Are the following applicable to the proposed project? <br />Wll the PV system layout provide the required three-foot wide clear access pathways <br />per Section 605.1 1 of the California Fire Code, and is this shown on lhe roof ptan? <br />yvill the PV system be tnstalbd m a roof hav,ng only orte roofirg layer with no <br />overlays? <br />Wll the PV array be flush rnounted to the existing roof so that the plane of the <br />modules (panels) are parallel to the plane of the rooP <br />Wll the PV system weigh rnaximum 4 pounds per square feet or less? <br />Will the PV system be installed where the modules do not overhang any roof edges <br />(such as eaves, gabled ends. ridges and hips)? <br />Vlf|fl the PV system be instalH w h a space oi 2" mifiimum b tro" nraxrnum betr,veen <br />the undersde of modules and the surface of lhe roof? <br />VMll the PV system be installed without using any ballast system or counter-weight <br />system? <br />Will the anchors be installed with a maximum horizontal anchor spacing of 6 feet <br />ard is this rnaximum horizontal spe.E stlown on the @ls? <br />Wil,lthe.miriirmurn 5/16" lag screws be hstalled wnh a minimrrr$ sf 2-112 incfi <br />embedrnent into roof rafteG (with pre-drilled holes) and is this rr*rinxrm errbedrrrent <br />shGtrn on the plans? <br />Are ALL the structural pages of the plans WET stamped and signed by a California <br />licensed professional engineer? (including project specific site plan, pV layout, <br />anchorage spacing, anchorage details and manufactureds PV support information.) <br />2 <br />4 <br />5 <br />dn <br />Mo <br />10 d tr <br />I certity under penalty o, perjury under the hws ot lhe State o, California that the above is true: <br />print Name: Evan Francis Signatu te. ( ,v.t,Ftaz<..2. <br />Date <br />EmarlAddress oermr (o)comoletesolar com <br />Rev 8i11 7/2O 15 <br />PhoneNumber: 650-610-1777