Laserfiche WebLink
*-SANTA <br />NA,"ffi <br />Planning & Building Agency <br />Building Safety Division <br />20 Civic Center Plaza <br />P.O. Box 1988 (M.19) <br />Santa Ana, CA 92702 <br />(714) 647.s800 <br />www.sa nta-ana.org <br />RESIDENTIAL <br />PHOTOVOLTAIC <br />CHECKLIST <br />sol-o1 cBC 2013 <br />Project Address:q5 EFvu 11 S I <br />Contractor Company Name: <br />Contractor License Number: <br />De an nc <br />46s lt1 <br />YES NOr Ktr <br />,da <br />. Etr <br />+ EItr <br />Are the following applicable to the proposed project? <br />Will the PV system layout provide the required three-foot wide clear access pathways <br />per Section 605.1 1 of the Callfornia Fire Code, and is this shown on the roof plan? <br />Will the PV system be installed on a roof having only one roofing layer with no <br />overlays? <br />Will the PV array be flush mounted to the existing roof so that the plane of the <br />modules (panels) are parallel to the plane of the roof? <br />Will the PV system weigh maximum 4 pounds per square feet or less? <br />-Will the Pv'system be installed where the modules do not overhang any roof edges <br />(such as eaves, gabled ends, ridges and hips)? <br />Will the PV system be installed with a space of 2" minimum to .10,' maximum between <br />the underside of modules and the qurface of the roof? <br />Will the PV system be installed without usjng any ballast system or counter-weight <br />system? <br />Will the anchors be installed with a maximum horizontal anchor spacing of 6 feet <br />and is this maximum horizontal spacing shown on the plans? <br />Will the minimum 5/16" lag screws be installed with a minimum of 2-1t? inch <br />embedment into roof rafters (with pre-drilled holes) and is this minimum embedment <br />shown on the plans? <br />Are ALL the structural pages of the plans stamped and signed by a California <br />licensed professional engineer? (including project specific site plan, pV layout, <br />anchorage spacing, anchorage details and manufacturer's pV support information.) <br />-El <br />6 EItr <br />7. Etr <br />8 EItr <br />9 EItr <br />rO EIE <br />I certify under penalty of perjury under the laws of the State of ornia that lhe above is true: <br />Print Name: <br />Phone Num <br />ao Sig nature <br />Date: <br />Email Address (-O <br />Rev: 11i 19/2015 <br />Z <br />rol <br />qo <br />en dea <br />solar Photovoltaic (Pv) checkrist for Detached SINGLE FAMILy RESIDENCES only <br />lnstructions: The licensed contractor of record shall complete all sections, answer the ten questions and <br />sign the certjflcation section below. A copy of this form shall be attached to each of TWO sets of plans, of <br />minimum 11" x 17" ,ir". lf ,n.*"rino NO to <br />"nv <br />of th" qr""tionr. pl"n <br />"h""k =hall b" ,"qrir"d.