Laserfiche WebLink
Planning & Building Agency <br />Building Safoty Division <br />20 Civic Center Plaza <br />P.O. Box '1988 (M-tg) <br />Santa Ana, C492702 <br />(714) 647-5800 <br />wwlY.santa-ana.org <br />RESIDENT!AL <br />PHOTOVOLTAIC <br />CHECKLIST <br />sol-01 cBc 2013 <br />Solar Photovoltaic (PV) Checklist for Detached SINGLE FAMILY RESIDENCES Only <br />lnstru ctions: The licensed contractor of record shall complete all sections, answer the ten questions an d <br />sign the certification section below. A copy of this form shall be attached to each of TWO sets of plans,of <br />minimum 11" x 17" <br />Project Address: <br />size. lf a nswerinq No to anv of the qu ions. olan c heck shall be uired. <br />1201 S Van Ness Ave Santa Ana, CA92707 <br />Contractor Company Name:Suncrest Solar <br />Contractor License Nu 6967. C-10,987868 <br />YES NOdu <br />ds <br />du <br />Are the following applicable to the proposed project? <br />Will the PV system layout provide the required three-foot wide clear access pathways <br />per Section 605.11 of the California Fire Code, and is this shown on the roof plan? <br />Will the PV system be installed on a roof having only one roofing layer with no <br />overlays? <br />Will the PV array be flush mounted to the existing roof so that the plane of the <br />modules (panels) are parallel to the plane of the roof? <br />Will the PV system weigh maximum 4 pounds per square feet or less? <br />Will the PV system be installed where the modules do not overhang any roof edges <br />(such as eaves, gabled ends, ridges and hips)? <br />Will the PV system be installed with a space of 2" minimum to 10" maximum between <br />the underside of modules and the surface of the roof? <br />Will the PV system be installed without using any ballast system or counter-weight <br />system? <br />Will the anchors be installed with a maximum horizontal anchor spacing of 6 feet <br />and is this maximum horizontal spacing shown on the plans? <br />Will the minimum 5/16" lag screws be installed with a minimum of 2-112 inch <br />embedment into roof rafters (with pre-drilled holes) and is this minimum embedment <br />shown on the plans? <br />Are ALL the structural pages of the plans WET stamped and signed by a California <br />licensed professional engineer? (lncluding project specific site plan, PV layout, <br />anchorage spacing, anchorage details and manufacturer's PV support information ) <br />do <br />do <br />ilu <br />da <br />10 d tr <br />I certify under penalty of Perjury under the laws of the State of Ca <br />Print Name Suncrest Solar <br />Phone Number: <br />Email Address: <br />800 376-41 l5 <br />1 <br />z <br />3 <br />4 <br />5 <br />tr <br />tr <br />dil <br />6 <br />7 <br />9 <br />Rev: 8/1712015 <br />p rocess@suncrestsolar.com <br />s true: <br />*,,SNTA <br />NA,'ffi <br />Signature: ^ t' '' .,'' f <br />Date: 3/ 10/2016