Laserfiche WebLink
*,,SANTA <br />NA <br />llr\tt\c <br />&BIII.DNC <br />{ct\cl <br />Planning & Building Agency <br />Building Safety Division <br />20 Civic Center Plaza <br />P.O. Box 1988 (M-19) <br />Santa Ana, CA92702 <br />(714) 647-5800 <br />www.santa-ana.org <br />RESIDENTIAL <br />PHOTOVOLTAIC <br />CHECKLIST <br />sol{l cBc 2013I <br />) <br />Solar Photovoltaic (PV) Checklist for Detached SINGLE FAMILY RESIDENCES Only <br />lnstructions: The licensed contractor of record shall fill rn the address of the project, contractor's <br />licensing information and answer questions 1 -10 below. Complete and sign the certification seclion <br />**lf answering NO to any ofthe questions, plan check shall be required.** <br />Project Address:2522 OAKMONI'AVE,NUL, SANI'A ANA, CA92706 <br />2 <br />3 <br />Contractor Company Name: <br />Contractor License Number: <br />YES NO <br />tr <br />tr <br />CI,IiAN INITIATIVI] I,I,C <br />trtr <br />Eltrtrtr <br />trtr <br />trtr <br /># l03tt-r76 IJ <br />Are the following applicable to the proposed project? <br />Will the PV array be flush mounted to the existing roof so that the plane of the <br />modules (panels) are parallel to the plane of the roof? <br />Will the PV system weigh maximum 3 pounds per square feet or less? <br />Will the PV system be installed where lhe modules do not overhang any roof edges <br />(such as eaves, gabled ends, ridges and hips)? <br />Will the PV system be installed with a. space of 2" minimum to 10' maximum between <br />the underside of modules and the surface of the roof? <br />Will the PV system be installed wlthout using any ballast system or counter-weight <br />system? <br />Will the PV system be installed on a roof having only one roofing layer with no <br />overlays? <br />Will the PV system layout provide a three-foot wide clear access pathway per the <br />latest edition ol "Guideline for Fire Safety Elements of Solar Photovoltaic Syslems" <br />by OCFA? (Guideline available on the OCFA website: htto://www.ocfa.orq) <br />Do the plans show a maximum horizontal anchor spacing of 6 feet? <br />Do the plans show a minimum of 2-l12inch lag screw embedment into roof rafters? <br />Are ALL the structural pages of the plans WET stamped and signed by a California <br />licensed professional engineer? (including project specific site plan, PV layout, <br />anchorage spacing, anchorage details and manufacturer's PV support information.) <br />E <br />4 <br />5 <br />6 <br />7 <br />tr <br />N <br />8 trtr <br />g. Etr <br />10. E fl <br />I certify un <br />Print name <br />Phone Number <br />Email Address <br />nder the laws of th <br />J <br />e State of <br />Srgnature <br />der penalty of perjury u <br />tn <br />Rev:211712015 <br />o <br />r L <br />Date <br />Cal rnia th the above i