Laserfiche WebLink
*,,SNTA <br />NA,tffi' <br />Planning & Building Agency <br />Building Safety Division <br />20 Clvic Center Plaza <br />P.O. Box l988 (M-19) <br />Santa Ana, CA 92702 <br />(714) 647-s800 <br />www.santa.ana.org <br />RESIDENTIAL <br />PHOTOVOLTAIC <br />CHECKLIST <br />soL"01 cBC 2013 <br />Solar Photovollaic (PV) Checklist for Oetached SINGLE FAIUILY RESIDENCES Only <br />lnstructlons: The licensed contractor of record shall complete all sections, answer the ten questions and <br />sign the certification section below. A copy of this form shall be attachsd to each of TWO sets of plans, of <br />minimum 1'1" x 17" size lf answerino NO anv of the ouestions. D lan check shall be requlred. <br />Proiect Address:2209 ORANGE AVE, SANTA ANA, CA 92707 <br />Contractor Company Name:SOUTHWEST SUN SOLAR, INC <br />contractorLicenseNumber: 1004667 <br />3 <br />4 <br />5 <br />YES NO <br />E tr <br />z. Etr <br />Etr <br />Eltr <br />AB <br />Etr <br />Ettr <br />Btr <br />Eltr <br />Are the followlng appllcable to the proposed proiect? <br />Will the PV systsm layoul provide the raquired three-foot wide clear access pathways <br />per Section 605.11 of the Califomia Fire Code, and is this shown on the roof plan? <br />Will ths PV systsm be installed on a roof having only one roofing layer with no <br />overlays? <br />Will the PV anay be flush mounted to the existing roof so that the plane of lhe <br />modules (panels) are parallel lo the plane of the roof? <br />Will the PV system weigh maximum 4 pounds per square feel or less? <br />Will the PV system be installed where the modules do not overhang any roof edges <br />(such as eaves, gabled ends, ridges and hips)? <br />Willthe PV system be installed with a space of 2'minimum to 10" maximum between <br />the underside of modules and the surface of the roof? <br />Will the PV syslem be installed without using any ballast system or counter-weight <br />system? <br />\,vill the anchors be installed with a maximum horizontal anchor spacing of 6 fset <br />and is this maximum horizontal spacing shown on the plans? <br />Will the minimum 5/16' lag screws be installed with a minimum ot 2-112 inch <br />embedment into roof rafters (with pre-drilled holes) and is this minimum embsdmsnt <br />shown on the plans? <br />Are ALL the structural pages of the plans WET stamped and signed by a Califomia <br />licensed professional engineer? (including projecl specific sile plan, PV layout, <br />anchorage spacing, anchorage details and manufaclure/s PV support information.) <br />6 <br />7 <br />8 <br />ro.EE <br />print Name: MlMl NGO <br />I certify under penalty of periury under the laws ot the State of California ii"r J6 true: <br />phone Number: 714 582 3909 <br />Signature <br />Date <br />Ema it Address: PERMIT@SOUTHWESTSUNSOLAR.COM <br />Rev: 8/1712015 <br />a <br />,.) <br />9.