Laserfiche WebLink
Planning & Building Agency <br />Building Safsty Division <br />20 Civic Center Plaza <br />P-O. Box 1988 (M-19) <br />Santa Ana, CA 92702 <br />(714) 647-s800 <br />www.santa-ana,org <br />RESIDENTIAL <br />PHOTOVOLTAIC <br />CHECKLIST <br />soL-01 cBC 2016 <br />Solar Photovoltaic (PV) Checklist for Detached SINGLE FAlrlLY RESIDENCES Onty <br />lnstructions: The licensed contractor of record shall complete all sections, answer the ten questions and <br />sign the certification section below. A copy ofthis form shall be attached to each of TWO sets of plans, of <br />minimum 1 1 " x 'l 7" size. lf answerino NO to anv of the o ons. Dlan check shall be reouired. <br />Project Address:b 6t. <br />Contractor Company Name: <br />Contraclor License Number: <br />1 <br />2 <br />3 <br />NO <br />tr <br />tr <br />tr <br />tr <br />tr <br />D <br />tr <br />,fi <br />B <br />7 <br />+f <br />4 <br />q <br />/ <br />Are the following applicablG to the proposed project? <br />Will the PV system layout provide the required three-foot wide clear access pathways <br />per Section 605.11 of the California Fire Code, and is this shown on lhe roof plan? <br />Will the PV system be installed on a roof having only one roofing layer with no <br />ovedays? <br />Will the PV anay be flush mounted to the existing roof so that lhe plane of the <br />modules (panels) are parallel to the plane of the roof? <br />Will the PV system weigh maxamum 4 pounds per square feet or less? <br />Will the PV system be instialled where the modules do not overhang any roof edges <br />(such as eaves, gabled ends, ridges and hips)? <br />Will the PV system be installed with a space of 2" minimum to 10" maximum between <br />the underside of modules and the surface of the roof? <br />Will the PV system be installed without using any ballast system or counter-weight <br />system? <br />Will the anchors be installed with a maximum horizontal anchor spacing of 6 feet <br />and is this maximum horizontal spacing shown on the plans? <br />Will the minimum 5/16" lag screws be installed with a minimum of 2-112 inch <br />embedment into roof rafters (with pre-drilled holes) and is this minimum embedment <br />shown on the plans? <br />Are ALL the slruclural pages of the plans stamped and signed by a California <br />licensed professional engineer? (including project specific site plan, PV layout, <br />anchorage spacing, anchorage details and manufacturer's PV support information.) <br />4 <br />5 <br />6 <br />7 <br />8 <br />9 D <br />10. <br />I certify under penalty of perjury un <br />PrintName: VAIAIA <br />Phone Number <br />Email Address: <br />e State of Cal <br />Signature <br />e <br />Rev: 8/29/19 <br />J <br />der lhe laws of thtlvr+a <br />ate <br />that <br />o <br />ts <br />tr <br />tr