My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
20170557 - Permit (2)
PBA
>
Building
>
Permits
>
C
>
Cedar St
>
2138 S Cedar St
>
20170557 - Permit (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/2/2021 12:00:13 PM
Creation date
6/2/2021 12:00:12 PM
Metadata
Fields
Template:
Permit
Permit Number
20170557
Full Address
2138 S Cedar St
Permit ID
262165
Master ID Number
2020-156993
Project Name
Miscellaneous Counter1 Permit
Street Number
002138
Street Direction
S
Street Name
Cedar
Street Suffix
St
Building Use Code
Resid-1 unit
Job Types
Solar
Permit Type
Electrical
Applied Date
1/9/2020
Issued Date
1/9/2020
Finalized Date
2/4/2020
Flood Zone
X-0602320278J
Description of Work
Install roof mounted solar panels. FEES PD ON 101102798.
Nature of Work
Solar
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
EXI,EDITED PERMIT I,RoCESS FoR SMALL_SCALE I,V SYSTEMS <br />STANDARD STRING SYSTEIvI <br />The informalion in this guideline is intended to help local jurisdictions and contractors identity when Pv system insrallarions <br />are simple. needing only a basic review and when an insEllation is more complex. Ir is likely rhar 50% -75% of all residenrial <br />systems wrll comply with these slmple cnteria. For projects that fa,l to meet the simple crireria, resolution sreps have been <br />su&gested to provide as a parh to permit approval. <br />Required Inlormation for Permit: <br />l. Site plan showing iocation ol major components on the property. This drawing need not be exacrly ro scale, but tt <br />should represent relative location of components at site (see supplied example site plan). PV arrays on dwellings <br />with a S perimeter space at ridge and sides may nor need separare nre service review <br />2. Electrical diagram showing PV array connguration. wiring system. overcurrent prorecrion, inverrer, disconnects. <br />required signs, and ac connecrion to building (see supplied smndard elecrrical diagram). <br />5. Specihcation sheets and installation manuals (if available) for all manufactured components including, but nor <br />limited to, PV modules, inverrer(s), combiner box, disconnecrs. and mounring system <br />Step 1 : Structural Review o[ PV Array Mounting System <br />ls tJre array to be mounted on a defined, permi$ed roof structure? Eyes Eno <br />U No due to non-compliant rc9f or a ground mount. submft completed worksheet.for the structure WKSI . <br />Roof lnJormation: <br />I Is rhe roohng rype ligh(weighr (Yes = composirion. lighrweighr masonry. meral, erc. )COMP SHINGLE <br />U No, submit completed wotksheet Jor rcoJ structure WKSI (No = heavy masonry, slate, etc . ) <br />2 Does the rool have a single roof coveringf Eyes !no <br />U No, submit completed worhsheet Jor rooJ structure WKS I . <br />3 Prov,de method and rype oI wearherproofing rool penetra ons (e.9. tlashing, caulk)Flashing <br />M ount ing Sy st em Information : <br />I ls the mounting s[ructure an <br />beneath the module frames? <br />en <br />Yes ! no <br />neered producr dcsi gned to mount PV modules with no more rhan an l S gap <br />If No, provid.e details oJ structural attachment certiled by a design proJessional. <br />2 F'or manulactured mounring systems. hll out informarion on rhe mounring syslem below <br />a Mountlng sysrem Manufacrurer EcoFasten Producr Name and N4q6s14 Rock it <br />b Total weight of PV Modules and g2115 7'12 4 165 <br />c Total Number of Atnchmenr Poinr <br />d. weighr per Arrachmenr Poinr (b - c) 32.4 lbs (iF grearer rhan 45 lbs. see wKS I ) <br />e. i\,4aximum Spacing Berween Aruchmenr Points on a Rail 48 inches (see producr manual for <br />maximum spacing allowed based on maximum design wind speed) <br />Total Surface Area oF PV Modules lsquare feer)246.5 frlt <br />o Disrribured Weighr of PV Module on Roof (b = f)lbs/ftl <br />IJ distributed welght ol the PV system is geater than 5 lbstf , see WKSI . <br />Step 2: Electrical Review o[ PV System (Calculations lor Electrical Diagram) <br />In order for a PV system to be considered for an expedited permit process, the following must apply: <br />l. PV modules, utility-interactive inverters, and combiner boxes are identined for use in PV systems. <br />2. The PV array is composed of 4 series srrings or less per inverter <br />f. The total inverter capacity has a conrinuous ac power output 13.440 watts or less <br />4. The ac interconnection point is on fhe load side of service disconnecring means (690.64(8)). <br />5 One of the standard electrical diagrams(El.l.El.la,El.lb,orEl.lc)canbeusedroaccuratelyrepresentthePV <br />system. lnteracrive PDF diagrams are available al wwwsolarabcs.org/permirring. <br />t:illoutthestatulardclcctricaldiagramcompletcl),Aguidetothaclectricaldiagramisprovidedtohelptheapplicant <br />understond edch bldnk tolll in lf the electrical s)/stetrt is more contplex than the standard electrical diagrant can ellecttvely <br />communiette providc on dlternative diagram with appruIrridk detuil <br />2 Ext'tt)tTtt) l' r.rltT l'R()ct\\ I()R l'V 5\'sttNrs
The URL can be used to link to this page
Your browser does not support the video tag.