Laserfiche WebLink
-,,SANTA <br />NA <br />[L$T{C <br />&IIIIDNC <br />Acil{c'l <br />Planning & Building Agency <br />Building Safety Division . <br />20 Civic Center Plaza <br />P.o. Box 1988 (M-19) <br />Santa Ana, CA92702 <br />(714) 647-5800 <br />www.santa-ana.org <br />RESIDENTIAL <br />PHOTOVOLTAIC <br />CHECKL!ST <br />sol-o1 cBC 2013 <br />Solar Photovoltaic (PV) Checklist for Detached SINGLE FAMILY RESIOENCES Only <br />Project Addressi 2242 S Flower St, Santa Ana, C492707 <br />Contractor Company Name: Solar 360 <br />contractor License Number, 46OtO <br />? <br />3 <br />No Are the following applicable to the proposed project? <br />tr Will the PV array be flush mounted to the existing roof so that the plane of the <br />modules (panels) are parallel to the plane of the roof? <br />tr Will the PV system weigh maximum 3 pounds per square feet or less? <br />tr Will the PV system be installed where the modules do not overhang any roof edges <br />(such as eaves, gabled ends, ridges and hips)? <br />E witt the PV system be installed with a space of 2" minimum to 10" maximum between <br />the underside of modules and the surface of the roof? <br />D Will the PV system be installed without using any ballast system or counter-weight <br />system? <br />E Witt the PV system be installed on a roof having only one roofing layer with no <br />overlays? <br />D witt lhe PV system layout provide a three-foot wide clear access pathway per the <br />latest edition oI "Guideline for Fire Safety Elements of Solar Photovoltaic Systems" <br />by OCFA? (Guideline available on the OCFA website: http://www.ocfa.orq) <br />tr Do the plans show a maximum horizontal anchor spacing of 6 feet? <br />tr Do the plans show a minimum oI2-l12incn lag screw embedment into roof rafters? <br />tr Are ALL the structural pages of the plans WET stamped and signed by a California <br />licensed professional engineer? (including project specific site plan, PV layout, <br />anchorage spacing, anchorage details and manufacturer's PV support informalion.) <br />I certify under penalty of perjury under the laws of the State of Califo e above is true: <br />Print name:t^tltU OJtgDo <br />YES <br />tr <br />tr <br />4 <br />5 <br />6 <br />7 <br />tr8 <br />9 <br />10 <br />x <br />x <br />Phone Number <br />Email Address: <br />Tq,B- bqb-\lql4b <br />Signature: <br />Date q <br />X <br />x <br />x <br />x <br />x <br />Rev:211712015 <br />n g6a6- -91o9- 6a <br />lnstructions: The licensed contractor of record shall fill in the address of the project, contractor's <br />licensing information and answer questions 1 -10 below. Complete and sign the certification section. <br />**lf answering NO to any of the questions, plan check shall be required.**