Laserfiche WebLink
,*-SNTA <br />NA-'ffiI <br />Planning & Building Agency <br />Building Safety Division <br />20 Civic Center Plaza <br />P.O. Box 1988 (M-19) <br />Santa Ana, CA 92702 <br />(714) 647-s800 <br />www.santa-ana.org <br />RESIDENTIAL <br />PHOTOVOLTAIC <br />CHECKL!ST <br />- <br />Solai Photovoltaic (PV) Checklist for Detached SINGLE FAMtLy RESIDENCES Onty <br />lnstructions: The licensed contractor of record shall complete all sections, answer the ten questions and <br />sign the certification section below. A copy of this form shall be attached to each of TWO sets of plans, of <br />soL-01 cBc 2013 <br />minimum 11" x 17" size. lf answerino NO to anv of the questions. Dl an check shall be required. <br />Project Address:2513 WEST HARVARD ST, SANTA ANA, CA 92704 <br />contractor company xame: SOUTHWEST SUN SOLAR, INC <br />conlractorLicenseNumber: 1004667 <br />4 <br />5 <br />6 <br />7 <br />YES NO <br />E tr <br />8 Eltr <br />9 Etr <br />10 Etr <br />Eltr <br />EXtr <br />Eltr <br />Etr <br />Etr <br />Etr <br />Are the following appllcable to the proposed project? <br />Will the PV system layout provide the required three-foot wide clear access pathways <br />per Section 605.11 of the Califomia Fire Code, and is this shown on the roof plan? <br />Will the PV system be installed on a roof having only one roofing layerwith no <br />overlays? <br />Will the PV anay be flush mounted to the exisling roof so that the plane ofthe <br />modules (panels) are parallel to the plane of the roof? <br />Will the PV syslem weigh maximum 4 pounds per square feet or less? <br />Will the PV system be installed where the modules do not overhang any roof edges <br />(such as eaves, gabled ends, ridges and hips)? <br />Wll the PV syslem be installed with a space of 2" minimum to 'lO" maximum between <br />the underside of modules and the surface of the roof? <br />Will the PV system be installed without using any ballast system or counter-weighl <br />sYstem? <br />Will the anchors be installed with a maximum horizontal anchor spacing of 6 feet <br />and is this maximum horizontal spacing shown on the plans? <br />Will the minimum 5/16" lag screws be installed with a minimum of 2-112 inch <br />embedment into roof rafters (with pre-drilled holes) and is this minimum embedment <br />shown on the plans? <br />Are ALL lhe structural pages of the plans WET stamped and signed by a Califomia <br />licensed professional enginee, (including proiect specific site plan, PV <br />anchorage spacing, anchorage details and manufucturei's PV support i ation.) <br />I certify under penalty of perj ury under the laws of the State of California the is true: <br />p1nt Name: lUlMl NGO Signature <br />Date:phone Number: 714 582 3909 <br />Emait Address: PERMIT@SOUTHWESTSUNSOLAR.COM <br />Rev: A11712015